Laserfiche WebLink
onitoring System Certification <br /> Site Address: 1501 N. JACK TONE RD Date of Testing/Service: 05/31/2007 <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 317.02 <br /> Complete the following checklist: <br /> x Yes No* Is the audible alarm operational? <br /> 0 Yes No* Is the visual alarm operational? <br /> 0 Yes [:]No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> 0 Yes No <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> ❑ <br /> interfere with their proper operation? <br /> Yes No* X N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑x Yes F-1 No* [:]N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑X Sump/Trench Sensors; ❑x Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ❑x Yes No <br /> Yes No* �X N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> properly? If so,at what percent of tank capacity does the alarm trigger? % <br /> 0 Yes* ❑No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> D Yes* ®No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> ❑ Water. if yes,describe causes in Section E,below. <br /> ❑X Yes No* Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> ❑X Yes ❑No* Is all monitoring equipment operational per manufacturers'specifications? <br /> *In Section E below,describe how and when these deficiences were or will be corrected. <br /> 6 E. Comments: <br /> DISP 23,23SLV,24,24SLV,25,25SLV,26,26SLV,27,27 SLV,28,28 SLV,29,29SLV,30,AND 30 SLV---ALL HAVE 208 <br /> SENSORS AND SHEAR VALVES. <br /> Page 2 of 3 Based on CA form dated 03/01 <br />