Laserfiche WebLink
7. Are fill / spilt containment boxes presently free of water, debris, and hazardous substances? 39 -PFJ 618 <br />(Use General Comments section to note details as needed) <br />TRUCKDSL <br />® a <br />M = <br />oMmmmm <br />m�0 <br />m <br />►- <br />®►:oma <br />❑ <br />❑ <br />11. Have fill / spill containment boxes been tested within the past 12 months? <br />®iaom <br />mono <br />❑ <br />5 23 12- <br />Z12. <br />lid <br />U/L 87 1 Fill I P9 <br />T#4 VR ® ❑ ❑ <br />■ ■ <br />Mr�0■ a <br />® <br />oMmmmm <br />ui <br />m <br />►- <br />o0 <br />❑ <br />■ ■ <br />Mr�0■ a <br />TRUCK DSL <br />T #3monomoon <br />® <br />oMmmmm <br />ui <br />TRUCK DSL <br />T #3monomoon <br />® <br />oMmmmm <br />10. Have the SB 989 Secondary Containment Tests been completed within the past 36 months? <br />�d <br />❑ <br />❑ <br />11. Have fill / spill containment boxes been tested within the past 12 months? <br />®iaom <br />❑ <br />❑ <br />5 23 12- <br />Z12. <br />lid <br />[3❑ <br />❑ <br />11 <br />7/8 - AUTO SIDE <br />moon <br />❑ <br />❑ <br />B. Are under -dispenser containment (UDC) areas presently free <br />of water, debris, and hazardous substances? <br />(Use General Comments section to note additional details as needed) <br />1/2 - AUTO SIDE 7E3[:3 <br />8a. Are UDC probes presently properly located (i.e., at lowest point <br />in sump)? <br />(Use General Comments section to note additional details as needed) <br />D9 ❑ ❑ U DG %' IQcN - ra S eq -c7 t- <br />❑ <br />3/4 - AUTO SIDE <br />10. Have the SB 989 Secondary Containment Tests been completed within the past 36 months? <br />�d <br />❑ <br />❑ <br />11. Have fill / spill containment boxes been tested within the past 12 months? <br />5/6 - AUTO SIDE <br />❑ <br />❑ <br />5 23 12- <br />Z12. <br />lid <br />[3❑ <br />❑ <br />11 <br />7/8 - AUTO SIDE <br />P9 <br />❑ <br />❑ <br />IN <br />❑ <br />❑ <br />9/10 - AUTO SIDE <br />❑ <br />❑ <br />14 <br />❑ <br />❑ <br />S • Z3- , Z <br />11/12- AUTO SIDE <br />❑ <br />❑ <br />❑ <br />NIA <br />❑ <br />❑ <br />❑ <br />13 - R/V SIDE <br />R5 -1.0 t Z. <br />❑ <br />❑ <br />❑ <br />❑ <br />14/15 - R/V SIDE <br />❑ <br />❑ <br />® <br />❑ <br />❑ <br />16 - RV SIDE <br />❑ <br />❑ <br />P <br />❑ <br />❑ <br />17 - MAIN & SAT - TRUCK <br />[�i <br />❑ <br />❑ <br />Qg <br />❑ <br />❑ <br />18 - MAIN & SAT - TRUCK <br />❑ <br />❑ <br />141 <br />❑ <br />❑ <br />19 - MAIN & SAT - TRUCK <br />❑ <br />❑ <br />❑ <br />❑ <br />20 - MAIN & SAT - TRUCK <br />❑ <br />❑ <br />❑ <br />❑ <br />21- MAIN & SAT - TRUCK <br />❑ <br />❑ <br />❑ <br />❑ <br />22 - MAIN & SAT - TRUCK <br />IN <br />❑ <br />❑ <br />❑ <br />❑ <br />23 - MAIN & SAT - TRUCK <br />Lg <br />❑ <br />❑ <br />Pq <br />❑ <br />❑ <br />24- MAIN & SAT - TRUCK <br />C,9 <br />❑ <br />❑ <br />Pq <br />❑ <br />❑ <br />25 - MAIN & SAT - TRUCK <br />p <br />❑ <br />❑ <br />0 <br />❑ <br />❑ <br />26 - MAIN & SAT - TRUCK <br />M <br />❑ <br />❑ <br />fA <br />❑ <br />❑ <br />27- MAIN & SAT - TRUCK <br />9 <br />❑ <br />❑ <br />❑ <br />❑ <br />28- MAIN & SAT - TRUCK <br />[A <br />❑ <br />❑ <br />09 <br />❑ <br />❑ <br />29- MAIN & SAT - TRUCK <br />❑ <br />❑ <br />❑ <br />_° ° ° ❑ <br />30- MAIN & SAT - TRUCK <br />❑ <br />❑ <br />9. Has a Monitoring System Certification been completed within the past 12 months? <br />Pq <br />❑ <br />❑ <br />10. Have the SB 989 Secondary Containment Tests been completed within the past 36 months? <br />�d <br />❑ <br />❑ <br />11. Have fill / spill containment boxes been tested within the past 12 months? <br />(9 <br />❑ <br />❑ <br />5 23 12- <br />Z12. <br />12. Has precision tank tightness testing (0.1 gph) been completed within the required timeframe? <br />❑ <br />❑ <br />11 <br />EXEMPT <br />13. Has precision line tightness testing (0.1 gph) been completed within the required timeframe? <br />❑ <br />❑ <br />0 <br />EXEMPT <br />14. Have other required tests or maintenance been completed within the required timeframes? <br />Mechanical Line Leak Detector testing? <br />0 <br />❑ <br />❑ <br />S • Z3- , Z <br />Pressurized Line Leak Detector (PLLD or WPLLD) testing? <br />❑ <br />❑ <br />IN <br />NIA <br />Vapor Recovery System Re -Verification testing ? <br />[5� <br />❑ <br />❑ <br />R5 -1.0 t Z. <br />15. Have all "facility employees" (FEs) responsible to respond to an alarm, overfill, spill or leak been trained by the )y(i ❑ ❑ <br />DO on UST system compliance within the past 12 months? f' <br />16. Have all FEs responsible to respond to an alarm, overfill, spill or leak, hired within the past 30 days received ❑ ❑ IQ <br />UST system compliance training by the DO? <br />NOTES: provide explanations for any 'NO" answer on the questions above in the General Comments section. Note answers that have not yet been resolved will require follow-up action. <br />Attach a copy of the Alarm History ReporULog to the Vic if available. if not available, explain why not in the General Comments section. <br />