Laserfiche WebLink
SWRCB, January 2002 Page of <br />This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br />appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Flying J Travel Center I Date of Testing: 6/6/2013 <br />Facility Address: 1501 N Jack Tone Rd. Ripon, California 95326 <br />Facility Contact: Manager Brian I Phone: 209-599-4141 <br />Date Local Agency Was Notified of Testing: 5/30/2013 <br />Name of Local Agency Inspector (f present during testing): N/A <br />2_ TESTING CONTRACTOR INFORMATION <br />Company Name: Jones Covey Group, Inc. <br />Pass <br />Technician Conducting Test: Steven A Sills <br />Not <br />Tested <br />Credentials: X CSLB Licensed Contractor <br />fJ SWRCB Licensed Tank Tester <br />License Type: A, B HAZ <br />License Number: 804431 <br />Manufacturer <br />Manufacturer Training <br />Component(s)) Date Training Expires <br />Incon Incon TS -STS <br />6/6/2015 <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />3. SUMMARY OF TEST RESULTS <br />Component <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs Component <br />Made <br />Pass <br />Fail <br />Not <br />Tested <br />Repairs <br />Made <br />T-1 Secondary Pipe <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />T-5 91 STP Sump Hydrostatic <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />RV UDC 16 Hydrostatic <br />X <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />If hydrostatic testing was performed, describe what was done with the water after completion of tests: <br />Water transferred into 55gallon drums, properly labeled and staged for recovery. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements <br />Technician's Signature: Date: 6/6/2013 <br />