My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 4:36:01 PM
Creation date
6/23/2020 6:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2014-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
€ * V .mom . <br /> c <br /> A10 20115 <br /> SWRCB,January 2002 e of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer ■Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum 0 Hydrostatic <br /> Other(Spec) <br /> Test Equipment Used: INCON STS Equipment Resolution: <br /> Sump# T1 STP Sump# T2 STP Sump# T3 STP Sump# <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 75" 72" 73" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 23" 20" 13" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 44" 43" 44" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 48" 46" 50" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No INA Yes No ■NA Yes No 0N Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe Yes No N NA Yes No ■NA Yes No ■NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No NNA Yes No ENA Yes No ■NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 15 minutes 15 minutes 15 minutes <br /> test: <br /> Test Start Time: 1:55pm 2:13pm 1:55pm 2:13pm 11:20am 11:42am <br /> Initial Reading(Rj): 5.6224 5.6109 6.0348 6.1071 2.3985 2.3962 <br /> Test End Time: 2:11 pm 2:28pm 2:11 pm 2:28pm 11:35am 11:57am <br /> Final Reading(RF): 5.6233 5.6109 6.0352 6.1070 2.3975 2.3951 <br /> Test Duration: 15min 15min 15min 15min 15min 15min <br /> Change in Reading(RF-RI): 0.0009 0.0000 0.0004 0.0001 0.0010 0.0011 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 0.002 0.002 <br /> Test Result: X Pass D Fail 29 Pass ❑Fart N Pass ❑Fail ❑ Pass ❑Fail, <br /> Was sensor removed for testing? ®Yes No NA ■Yes No NA ■Yes No NA Yes No NA <br /> Was sensor properly replaced and yes No NA ■Yes No NA ■Yes No NA Yes No NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.