Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Page 1 of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ® 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEMS) CIASO LINF.TANK 44 <br /> FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - 1 <br /> BUSINESS NAME(Same as FACILITY NAME) Flying J Travel Plaza-#618 3. <br /> BUSINESS SITE ADDRESS 1501 N. Jack Tone Rd 103• CITY Ripon 104. <br /> L.EQUIPMENT'.TESTING;A;ND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> _�23 CCR 2632,2634 26382641 <br /> __.....- _ - _- -- ------ ------ - _� _ <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER 490-3b <br /> (Specify): 490.7b <br /> III.MO1vITORING.I,OCATIONS <br /> ®1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 112.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490A <br /> IY:.TANK;MONITORING IS:PERFORMED-USING:THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY ® b.LIQUID FILLED El c.PRESSURIZED ❑d.UNDER VACUUM ago-6 <br /> -- - - -- _- -- --- ---- - __ -------- --- --- <br /> PANEL MANUFACTURER: Veeder Root 490:f MODEL#: TLS-350 49as <br /> ----- -__- _ - - _ -- --- ---------------- __ - --- --- -- - - _ <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-9' MODEL#(S): 794380-303 490-10 <br /> 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 49x12. MODEL#: 490- <br /> --------------------- ---- ---- ---------_____--_.___- __-__---------------------------- ----------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> -^--- ---____-- <br /> -- <br /> --------------_ _ -------__-____------------- --16 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY ago-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17 <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS eci 490-18 <br /> g•P• g•P• (Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> E] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS El b.60 HOURS 4990-22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY El b.BIENNIALLY ❑ c.OTHER(Specify): 490-24 <br /> �)� 490-25 <br /> 490-26 <br /> ®99.OTHER (Specify):VISUAL DONE DAILY 490.27 <br /> V..PIPE'MONITORING I$ ERFORMED USING,;TRYFOLLOWINGMETHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:®a.DRY ❑b.LIQUID FILLED [1c.PRESSURIZED ❑d.UNDER VACUUM - 490'21 <br /> 490-30 490-3I <br /> Root MODEL#: T <br /> oo <br /> PANEL MANUFACTURER: Veeder RLS-350 <br /> -- -- --- ------------------------ <br /> -- <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490.32 490-33 MODEL#(S)_ 794380-208 - ��- <br /> -- PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ®a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 490.35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED�23 CCR_§2636Z_-_ 490-36 <br /> MLLD MANUFACTURER(S): FE PETRO 490 37 MODEL#(S): MLD 490-39 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2_636) .490-39 <br /> ELLD MANUFACTURER49040. <br /> S) MODEL#(S): - <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 49043 <br /> ELLD FAILUREMISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490.44 <br /> 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49046 49047 <br /> ❑ 5.VISUAL PIPE MONITORING. 4104$ <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> •Allowed for monitoring orunburied emergency enemtor fuel piping only per HSC§25281.5 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)j. 490.50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490.51 <br /> 490-52 <br /> ❑ 99.OTHER(Specify) 490.53 <br /> UPCF UST-D(12/2007)7/23 <br />