My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 4:36:01 PM
Creation date
6/23/2020 6:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2014-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> JONES COVEY GROUP, INC. <br /> DAILY REPORT <Et�> RE"-#""\o"W D <br /> Client: Pilot Flying J#618 Date: Febr 7 4 <br /> Site Address: 1501 N.Ripon Ca.95326 Project#: FC#13109 <br /> City,State,Zip: Ripon,Ca.95366 W�Client Contact: ' Elr. -- <br /> ���a�•_ALT <br /> Scope Of Work: Bio Diesel in stallion Prepared By: <br /> Weather: Cool/Cloudy Rain Temperature: 60s <br /> Employee Hours <br /> Time in Time Travel Scope Testing Extra S Change <br /> Name out Workc c Equipment 'o Vendor Po# Order <br /> ~_ = YIN <br /> Ton 8:00 18:30 8 2 10.0 <br /> Re ino 8:00 18:30 8 2 10.0 <br /> Robert T 8:00 18:30 8 2 1 10.0 <br /> Rudy M 14:30 17:30 3 3.0 <br /> Termination#s: <br /> Materials Subcontractors <br /> Description PO Company Activity <br /> Field Activities: Arrived @ site in formed manager ofthe pumps to be shut down to repair test boots.Pressure up lines to pertest <br /> secondary pipingruns.Troubleshot and made ad'stments in LDCs on the test boots.Aided Ml;B with backlilling trenches to recent <br /> undermining of the surounding surface cover.While on site the site had a L-6 alarm due to water intrusion on the auto diesel SIP sump. <br /> Assisted with remoVng water and placed into labeled drum on site.Attemped to reseal manwa eeder-Root all functions normal. <br /> Cleaned up site <br /> NOTE: all annular risers are all rotted &detonating &need to be replaced due to corrosion <br /> TECH:A.A uilar liGnt Approval: Ste:27Feb14 <br /> RECEIVED <br /> AUG 2 2 201 <br /> ENVIRONMENTAL HEALTH <br />
The URL can be used to link to this page
Your browser does not support the video tag.