Laserfiche WebLink
9 0 <br /> 7. Are fill/spill containment boxes presently free of water,debris,and hazardous substances? 39-PFJ 618 <br /> (Use General Comments section to note details as needed) <br /> •7 • C• 7o7l <br /> TRUCK DSL Fill U/L 87 Fill ® ❑ Fill CI ❑T #1 VR ❑ T#4 VR � ❑ ❑ VR ❑ ❑ ❑ <br /> TRUCK DSL Fill I i ❑ U/L 89 Fill ( } ❑ Fill El ❑ <br /> T #2 VR ❑ ❑ 10 1 T#5 VR I ❑ ❑ I VR ❑ ❑ ❑ <br /> TRUCK DSL Fill l 9 ❑ AUTO DIESL Fill Q� ❑ —� Fill ❑ ❑ <br /> T #3 VR ❑ ❑ 1 E T#6 I VR ❑ ❑ j L IVR ❑ ❑ 1 ❑ <br /> 8. Are under-dispenser containment(UDC)areas presently free 8a. Are UDC probes presently properly located(i.e.,at lowest point <br /> of water,debris,and hazardous substances? in sump)? <br /> (Use General Comments section to note additional details as needed) (Use General Comments section to note additional details as needed) <br /> • • • • <br /> 1/2 - AUTO SIDE ❑ ❑ UDC CC - �E�S&(L-O <br /> 3/4 - AUTO SIDE I� ❑ El ❑ ❑ <br /> 5/6 - AUTO SIDE q5 ❑ El El El <br /> 7/8 - AUTO SIDE [I El El ( ❑ <br /> 9/10 - AUTO SIDE ❑ CI 5 ❑ ❑ <br /> 11/12- AUTO SIDE ( ❑ ❑ X 1 ❑ ❑ <br /> ❑ ❑ ❑ ❑ ❑ ❑ <br /> 13 - R/V SIDE gi ❑ ❑ ❑ El- <br /> 14/15 <br /> 14/15 - R/V SIDE ❑ CI Cat ❑ ❑ <br /> 16 - RV SIDE ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ CI ❑ <br /> 19 - MAIN & SAT - TRUCK ❑ ❑ CI ❑ <br /> 20 - MAIN & SAT - TRUCK ❑ ❑ 5E ❑ ❑ <br /> 21- MAIN & SAT - TRUCK ❑ ❑ �K ❑ ❑ <br /> 22 - MAIN & SAT - TRUCK ❑ ❑ ❑ ❑ iT E V! <br /> 23 - MAIN & SAT - TRUCK ❑ ❑ ❑ ❑ <br /> 24- MAIN & SAT - TRUCK ❑ ❑ [1 ❑ ❑ <br /> 25 - MAIN & SAT - TRUCK ❑ ❑ q5 ❑ ❑ <br /> 26 - MAIN & SAT - TRUCK IP ❑ ❑ ElEl27- MAIN & SAT - TRUCK �1 El El QE ❑ El28- MAIN & SAT - TRUCK �4 El �R 11El29- MAIN & SAT - TRUCK 59 El El El ❑ <br /> 30- MAIN & SAT - TRUCK X ❑ ❑ ❑ ❑ <br /> '"P41"MmIn. Ill Will I • t. ®. <br /> 9. Has a Monitoring System Certification been completed within the past 12 months? ❑ ❑ �j Z2 l3 <br /> 10. Have the SS 989 Secondary Containment Tests been completed within the past 36 months? ❑ ❑ - 2,7- , <br /> 11. Have fill/spill containment boxes been tested within the past 12 months? ❑ ❑ ---22- <br /> 12. Has precision tank tightness testing(0.1 gph)been completed within the required timeframe? ❑ ❑ N EXEMPT <br /> 13.Has precision line tightness testing(0.1 gph)been completed within the required timeframe? ❑ ❑ 0 EXEMPT <br /> 14. Have other required tests or maintenance been completed within the required timeframes? <br /> Mechanical Line Leak Detector testing? [d ❑ ❑ �- 'ZZ. `3 <br /> Pressurized Line Leak Detector(PLLD or WPLLD)testing? ❑ ❑ N N/A <br /> Vapor Recovery System Re-Verification testing? ()K ❑ ❑ <br /> MOM=e • <br /> 15. Have all"facility employees"(FEs)responsible to respond to an alarm,overfill,spill or leak been trained by the ❑ ❑ <br /> DO on UST system compliance within the past 12 months? <br /> 16. Have all FEs responsible to respond to an alarm,overfill,spill or leak,hired within the past 30 days received ❑ ❑ <br /> UST system compliance training by the DO? <br /> NOTES Provide explanations for any"NO"answer on the questions above in the General Comments section.Note answers that have not yet been resolved will require follow-up action. <br /> Attach a copy of the Alarm History ReporULog to the VIC if available.If not available,explain why not in the General Comments section. <br />