My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 4:36:01 PM
Creation date
6/23/2020 6:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2014-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mar. 11. 2014 2:05PM No. 3621 P. 3 <br /> HCAJEIVNED <br /> UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) MAR 1 1 2014 <br /> 1. Site map enclosed? YES bd NO[] ENVIRONMENTAL <br /> copies of ICC Service T HEALTH DEPARTMENT <br /> 2. Submit co <br /> p Technician and/or[nskaller'a cert�ficake and all manufacturer training certificates for each <br /> person installing or testing any component that Is repaired or replaced. Ensure a copy of the"Site Health and Safety <br /> Plan is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. if repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace the existing siphon piping penetration in T-3 piping sump. <br /> Supply and install an additional piping and an additional electrical penetration fitting in T-3 piping sump. <br /> Replace the three existing steel annular space risers on T-1.T-2,and T-3(the three diesel tanks)with <br /> AO Smith fiberglass risers. <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> Diversified Repair penetration Fitting (Part #RBK 8-2 .5) <br /> Diversified repair penetration part#RBK 8.2.5&RBK 4-1.111 <br /> AO Smith 4"Fiberglass Pipe(Part#011040-191-4)&AO Smith 4"Bell X Male(Part#012940-191-4) <br /> Ata Smith Adhesive Kit(Part#02990-000-1) <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.