Laserfiche WebLink
7. Are fill/spill containment boxes presently free of water,debris,and hazardous substances? 39—PFT 61$ <br /> (Use General Comments section to note details as needed) <br /> TRVCK DSL I!Fill VIL 87 Fill 0 Fill 910 <br /> T#1 V R 170 09 El 0 11 —�n T#4 VR 0 BIO DIESELVR 0 ❑ <br /> TRUCK DSL I Fill 1 25 1 El 11 V& 89 Fill [$ 1 ❑ Fill 0 [�D <br /> T #2 0 0 T#5 VR Q9 VR 0 1 [1 0 <br /> TRTCK#3 SL viR I A 0DIE4 ETF--]El 0 0 1-7T#6 El <br /> 8. Are under-dispenser containment(UDC)areas presently free Be. Are UDC probes presently properly located(i.e.,at lowest point <br /> of water,debris,and hazardous substances? in sump)? <br /> (Use General Comments section to note additional details as needed) (Use General Comments section to note additional details as needed) <br /> 1/2 - AVTO SIDE N n 0 � C] f-I V D C' Cj_a- p <br /> ,pe <br /> 3/4 - AVTO SIDE �a 0 0 W 0 El <br /> 5/6 - AVTO SIDE 11 1P 11 0 0 <br /> 7/8 - AVTO SIDE 0 0 1 1 0 0 0 17 <br /> 9/10 - AUTO SIDE � El 0 El El <br /> 11/12- AVTO SIDE s 0 0 D9 El 0 <br /> 0 0 0 n n Ei <br /> 13 - R/V SIDE 0 0 0 0 <br /> 14/15 - R/V SIDE 0 0 (A 0 n <br /> 16 - PV SIDE tp [I El [P 0 0 <br /> o o ri 0 0 0 <br /> 19 - MAIN A SAT - TRUCK QS 0 0 1g0 0 <br /> 20 - MAIN & SAT - TRVCK [P 0- 0 P 0 El <br /> 21- MAIN & SAT - TRVCK 0 0 [A 0 E3_ <br /> 22 - MAIN & SAT - TRUCK 0 0 � 0 El <br /> 23 - MAIN & SAT - TRVCK 11 0 04 0 0 <br /> 24- MAIN & SAT - TRVCK 0 0 0 M E3 0 <br /> 25 - MAIN & SAT - TRVCK 1P 0 0 11 El El JUN C) <br /> 26 - MAIN & SAT - TRVCK Ca El El 1P 0 0 <br /> 27- MAIN & SAT - TRVCK [5q El 0 ll <br /> 28- MAIN A SAT - TRUCK 0 <br /> 0 <br /> 29- MAIN & SAT - TRVCK 0 El 0 0 <br /> 30- MAIN & SAT - TRVCK —IN 0 11 0 0 <br /> 9.Has a Monitoring System Certification been completed within the past 12 months? 0 E3 e k--A <br /> 10.Have the SB 989 Secondary Containment Tests been completed within the past 36 months? <br /> 11.Have fill/spill containment boxes been tested within the past 12 months? 0 El 5 . kA k,4 <br /> 12.Has precision tank tightness testing(0.1 gph)been completed within the required timeframe? 0 F-1 N EXEMPT <br /> 13.Has precision line tightness testing(0.1 gph)been completed within the required timeframe? 11 E3 0 EXEAWT <br /> 14.Have other required tests or maintenance been completed within the required timeframes? <br /> Mechanical Line Leak Detector testing? S 0 E3 <br /> Pressurized Line Leak Detector(PLLD or WPLLD)testing? 1:1 0 0 NIA <br /> Vapor Recovery System Re-Verification testing? ER 0 0 <br /> 15. Have all"facility employees"(FEs)responsible to respond to an alarm,overfill,spill or leak been trained by the El 0 <br /> DO on LIST system compliance within the past 12 months? <br /> 16. Have all FEs responsible to respond to an alarm,overfill,spill or leak,hired within the past 30 days received 0 0 X <br /> UST system compliance training by the DO? <br /> NOTES: Provide explanations for any"Wanswer on the questions above in the General Comments section.Note answers that have not yet been resolved will require follow-up action. <br /> Attach a copy of the Alarm History ReportLog to the VIC if available.If not available,explain why not in the General Comments section. <br />