My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2014-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 4:36:01 PM
Creation date
6/23/2020 6:57:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2015
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2014-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: T Check this box iftank gauging ioused only for inventory,"J6N 12 2 01 <br /> o Check this box ifnntank gauging o,SIR equipment ioinstalled. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. H, PA NTA� <br /> 0 Yes 0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes 0 No* Was accuracy of system water level readings tested? <br /> 0 Yes 0 No* Were all probes reinstalled properly? <br /> Ei Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): [O Check this box if LLDu are not installed. <br /> followingComplete the » mi <br /> EV Yes 0 No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> 0 N/A that apply) Simulated leak rate:[U3 g.p.h.;[JOA g.p.h;[]0.2 g.p.h. <br /> EX Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> [if Yes 0 No* Was the testing apparatus properly calibrated? <br /> [if Yes 0 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 11 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> 19 N/A disconnected? <br /> 0 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> R N/A fails a test? <br /> 0 Yes Li No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> [;r Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> M. Comments: <br /> Monitoring System Certification poop of 12m7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.