Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: T Check this box iftank gauging ioused only for inventory,"J6N 12 2 01 <br /> o Check this box ifnntank gauging o,SIR equipment ioinstalled. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. H, PA NTA� <br /> 0 Yes 0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes 0 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes 0 No* Was accuracy of system water level readings tested? <br /> 0 Yes 0 No* Were all probes reinstalled properly? <br /> Ei Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): [O Check this box if LLDu are not installed. <br /> followingComplete the » mi <br /> EV Yes 0 No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance?(Check all <br /> 0 N/A that apply) Simulated leak rate:[U3 g.p.h.;[JOA g.p.h;[]0.2 g.p.h. <br /> EX Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> [if Yes 0 No* Was the testing apparatus properly calibrated? <br /> [if Yes 0 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> 11 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> 19 N/A disconnected? <br /> 0 Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> R N/A fails a test? <br /> 0 Yes Li No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> [;r Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> M. Comments: <br /> Monitoring System Certification poop of 12m7 <br />