Laserfiche WebLink
STEP 8 <br /> BEAD ADHESIVE <br /> HEAVILY ON ALL SEAMS <br /> 3600 DEGREES AROUND <br /> FITTING BEFORE <br /> CLEANUP M <br /> Z <br /> k <br /> f a <br /> Z <br /> e <br /> PIPE CLAMP <br /> SEAL YOUR FITTING <br /> BODY TOGETHER. <br /> Stick this assembly to the wall and apply a strong pressure to push the halves <br /> together and against the wall, aligning the marked stripe. When joined, rotating <br /> the fitting back and forth helps. <br /> Adhesive should ooze from every seam and joint while pushing the fitting halves <br /> together against the pipe and wall. Clean the face of the fitting with acetone or <br /> equivalent and remove excess adhesive. You want the fitting clean enough to <br /> remove the pipe clamp after the fitting cures. <br /> Use provided pipe clamp to secure the fitting halves to each other. More adhesive <br /> may ooze from the split seams as you tighten, re-clean as necessary. <br /> TWISTLET THE FITTIN'G(s) C U RE DO NOT CAUSE PIPE <br /> OR CONDUITS TO MOVE OR <br /> After a full cure, remove the pipe clamp holding the two fitting halves together. If it is <br /> too difficult to remove and appears to be bonded in place, do not force it off. <br /> b1hij V, L • <br /> TESTI (Water Testing): <br /> After the F-Series Retrofit-S Fittings are installed and have fully cured, water level test to a <br /> maximum of 2" above the highest penetration fitting on the sump. Follow local regulations. <br /> 13 ii-F-Series-Retrofit-S-131 <br /> r <br />