My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES M NO [] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Trench and install new underground conduit from main pull box to the following <br /> tank annulars: T1 diesel, T2 Diesel, T3 Diesel, T4 87, T5 91, and T6 Auto Diesel. <br /> Trench and install new underground conduit from main pull box to Diesel Canopy <br /> east-most column. <br /> Run electrical conduit up canopy column and along top of canopy to drop down at each <br /> dispenser island column and enter at side of each of the following dispensers: <br /> 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 30 and 30 Satellite. <br /> Pull in new 18 awg interstitial wiring to each location. <br /> Install (replace like-for-like) new Veeder Root Sensor at each Diesel Dispenser UDC (24 total): <br /> 19, 19s, 20, 20s, 21, 21 s, 22, 22s, 23, 23s, 24, 24s, 25, 25s, 26, 26s, 27, 27s, 28, 28s, 29, 29s, <br /> 30, and 30s. <br /> Perform Sensor functionality testing. <br /> Perform any testing required by agency as condition of permit. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> Belden 8760 Multi-Conductor Shielded Twisted Pair Cable <br /> (24) Veeder Root Sump Sensor PN: 794380-208 <br /> BECEIVED <br /> LIRI fl 2019 <br /> p T��AESIT <br /> EH230038(revised 7-26-2016) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.