My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />5. SECONDARY PIPE TESTING <br />Page 4 of 14 <br />Test Method Developed By: <br />❑ Piping Manufacturer A Industry Standard <br />❑ Other (Spec) <br />7 Professional Engineer <br />Test Method Used: <br />X Pressure <br />F] Other (Spec) <br />❑ Vacuum <br />❑ Hydrostatic <br />Test Equipment Used: Analog Gauge <br />Equipment Resolution: +/-0.25 <br />NNNONM�= <br />Piping Material: <br />Piping Run # T1 Main <br />Fiberglass <br />Piping Run # 19SAT <br />Fiberglass <br />Piping Run # 20SAT Piping Run # T2 Main <br />Fiberglass Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />4" <br />3" <br />3" <br />4" <br />Length of Piping Run: <br />260' <br />15' <br />15' <br />280' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Diesel <br />Method and location of <br />piping-run isolation: <br />T1 Trans to 19 & 20 <br />19 Main to 19 Sat <br />20 Main to 20 Sat T2 Trans to 21 - 25 <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />15 Min <br />15 Min <br />15 Min <br />15 Min <br />Test Start Time: <br />3:25pm <br />12:15pm <br />12:45pm <br />5:00pm <br />Initial Reading (RI): <br />5.00 psi <br />5.00 psi <br />5.00 psi <br />5.00 psi <br />Test End Time: <br />4:25pm <br />1:15pm <br />1:45pm <br />6:00pm <br />Final Reading (RF): <br />5.00 psi <br />5.00 psi <br />5.00 psi <br />5.00 psi <br />Test Duration: <br />1 hr <br />1 hr <br />1 hr <br />1 hr <br />Change in Reading (RF-RI): <br />0.00 psi <br />0.00 psi <br />0.00 psi <br />0.00 psi <br />Pass/Fail Threshold or <br />Criteria: <br />0.00 psi <br />0.00 psi <br />0.00 psi <br />0.00 psi <br />Test Result: <br />® Pass ❑ Fail <br />19 Pass ❑ Fail <br />®- Pass <br />❑ Fail ® Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />r-% <br />r- r% r-- Ix f N. -D <br />ri <br />Lz� ka L., I V <br />MAN 0 8 2W <br />
The URL can be used to link to this page
Your browser does not support the video tag.