My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />Page 10 of 14 <br />7. UNDER -DISPENSER CONTAINMENT UDC TESTING <br />Test Method Developed By: <br />❑ UDC Manufacturer ® Industry Standard <br />❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure <br />❑ Vacuum <br />X Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: INCON TS -STS <br />Equipment Resolution: +/- 0.002" <br />UDC # 21 Master <br />UDC # 21 Satellite <br />UDC # 22 Master <br />UDC # 22 Satellite <br />UDC Manufacturer: <br />Unknown <br />Unknown <br />Unknown <br />Unknown <br />UDC Material: <br />Fiber lass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />30" <br />30" <br />30" <br />30" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />13" <br />13" <br />14" <br />13" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />9" <br />9" <br />Condition of UDC prior to <br />Dry <br />Dry <br />Dry <br />Dry <br />testing: <br />Portion of UDC Tested' <br />17" <br />17" <br />18" <br />17" <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />❑ Yes []No X NA <br />❑ Yes ❑ No ® NA <br />[]Yes ❑ No ®NA <br />❑ Yes ❑ No 9 NA <br />product and water)?" <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?' <br />❑ Yes []No ® NA <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No 9 NA <br />❑ Yes ❑ No 9 NA <br />Was fail-safe verified to be <br />operational?* <br />❑ Yes ❑ No 9NA <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA <br />❑ Yes ❑ No X NA <br />Wait time between applying <br />pressure/vacuum/water and <br />15min <br />15min <br />15min <br />15min <br />starting test <br />Test Start Time: <br />9:58am <br />10:17am <br />10:17am <br />2:05pm <br />Initial Reading (RI): <br />2.8714" <br />4.3489" <br />2.5796" <br />2.0263" <br />Test End Time: <br />10:13am <br />10:32am <br />10:32am <br />2:20pm <br />Final Reading (RF): <br />2.8712" <br />4.3488" <br />2.5793" <br />1.9942" <br />Test Duration: <br />15min <br />15min <br />15min <br />15min <br />Chane in Reading (RF -RI): <br />0.0002" <br />0.0001" <br />0.0003" <br />0.0321" <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: <br />® Pass Q Fail <br />® Pass ❑ Fail <br />M Pass <br />❑ Fail <br />❑ Pass ® Fail <br />Was sensor removed for testing? <br />X Yes []No ❑ NA <br />® Yes ❑ No ❑ NA <br />9 Yes [I No ❑ NA <br />X Yes ❑ No ❑ NA <br />Was sensor properly replaced andlW <br />verified functional after testin ? <br />Yes []No 11 NA <br />7111F.]-I1111X Yes No NA <br />A Yes No NA <br />L Yes No <br />NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Disp. 22 Satellite Failed, needs repairs & re -tested. <br />r <br />rl <br />LZ: %res LZ <br />D <br />ENVIRONMENTAL HEALTH <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.