My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 8:36:01 AM
Creation date
6/23/2020 6:57:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016-2017
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pilot Flying J -1501 N.Jack Tone ,Ripon Ripon CA <br /> Pilot Flying J#618 <br /> 1501 N.Jack Tone Rd. <br /> S-9amw <br /> Ripon, CA 95366 <br /> STP_Tlpale Sup <br /> -FR 6uGal <br /> WY <br /> 9eAub,nY,c T_G_ <br /> T$TSump <br /> <br /> Viclnitv Mao: <br /> -Saw cut and remove concrete at <br /> trenching area <br /> -install new underground electrical <br /> conduit per code. <br /> -perform pre-backfill inspection. <br /> -Backfill and pour concrete back to <br /> match existing. Scope of Work: <br /> -Pull in now 18 awg veeder root <br /> -Saw cut and remove concrete at <br /> interstitial wiring to each location: <br /> Ti A,T2 A,T3 A,T4 A,T5 A,T6 A. s trenching area <br /> Dispenser islands:19,20,21,22, <br /> -install new underground electrical <br /> conduit per code. <br /> 23,24,25,26,27,28,29,30,and -Perform pre-backfill irspection. <br /> 30 Satellite <br /> -Connect existing sensors to new ^ u Is -Backfill and pour concrete back to <br /> wiringmatch existing. <br /> Perform sensor functionality test. -Pull in new 18 awg veeder root <br /> interstitial wiring to each location; <br /> T1 A,T2 A,T3 A,T4 A,T5 A,T6 A. <br /> Dispenser islands:19,20,21,22, <br /> 23,24,25,26,27,28,29,30,and <br /> 30 satellite. <br /> -Connect existing sensors to new <br /> wiring. <br /> -Perform sensor functionality test. <br /> Scale <br /> NTS Job#: <br /> Pilot 618 Ripon-Sensor Wiring <br /> ReWsims: <br /> ® 5595 Luw NnN R0.p100 <br /> Sump anp 9pR Rudy Ranch C nBa,U91]30 <br /> RECEIVED <br /> OCT 1 6 L".0117 <br /> ENVIRONMENTAL HEALTH <br /> DEPARTMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.