Laserfiche WebLink
UG2 6 Z016 <br /> OPW EDGE" Double-Wall Materials n <br /> Spill i r <br /> Cover: Cast iron <br /> Designed in collaboration with <br /> contractors and end users,the OPW Mounting Ring: Duragard coated <br /> EDGE""Double-Wall Spill Container ductile iron <br /> installs in the same space as single-wall Bellows: Polyethylene <br /> buckets.The EDGE"delivers best-in- Base: Cast iron E-coating <br /> class features that significantly improve Clamps: Stainless steel <br /> reliability, installation,testing and ease Seals: Buna-N <br /> of serviceability.The EDGE"exceeds the <br /> performance levels of all other double- <br /> wall spill containers. <br /> Features <br /> Unbeatable installation ease <br /> Top Mounted Vacuum Test Port <br /> Uses existing riser pipe ® For quick and easy access <br /> Unparalleled serviceability 40, Superior Visual Gauge <br /> Superior quality ® No messy dipsticks to contend with <br /> Significantly reduces installation a Significantly simplifies and reduces <br /> time and labor costs testing time Patent-Pending Ledge Design <br /> Ease of Access to the Electronic * Provides machined sealing face for <br /> 411 Sensor for Testing drop tube <br /> • Easy access for testing ® Improves overall drop tube <br /> ® Located to eliminate damage sealing integrity <br /> potential during product drops ® Eliminates face seal adaptors <br /> Roto-Molded Primary & or de-burring of the riser pipe <br /> Secondary Buckets to obtain a flat surface for the <br /> drop tube <br /> ®Thicker walls for greater durability patent-Pendin Removable <br /> Sealable Cover Option Available and reliability g <br /> Adaptor <br /> Ribbed Polyethylene •Allows for quick and easy access <br /> 16-5/8" Skirt Design <br /> to drop tube <br /> ® Roto-molded for long-life durability a Eliminates the need for <br /> • Provides rigidity for added cumbersome chain wrenches <br /> durability Bellow Seals <br /> ® Provides handles on all sides for <br /> 16-17/32" ease of installation ® Improves overall sealing integrity <br /> Grade level ® Eliminates mess and curing time <br /> to riser pipe Patent-Pending Socket Design <br /> found in sealants <br /> e Enables the EDGE'to install into . Reduces service time and costs <br /> the space of a single-wall spill <br /> container <br /> i ® Helps to align bucket on riser <br /> Weight:120 lbs.(54.5 kg.) Listings CW <br /> Certifications Mjssouri OENR Apprpyed California Air Resources Board ULC <br /> 52 CD1 F30 VV-* <br /> o <br />