Laserfiche WebLink
6/11/2015 0 Pilot Flying J #618 Ripon Site Map <br />L l <br />L L I� <br />UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br />UST Monitoring Site Plan JUN 0 3 2016 <br />4 - is - . <br />Site Address: Pilot Flying J – 1501 N. Jack Tone Rd., Ripon CA <br />LEGEND <br />D= Dispenser <br />P- Monitodng Control Panel <br />S- Sensor <br />STP= Turbine Sump <br />F=Fill Bucket <br />V= Vapor Bucket <br />A=Annular Sensor <br />M- Automatic Tank Gage <br />TS= Transition Sump <br />L= Line Leak Detector <br />Product Lines= <br />Vent Lines= --------------- <br />VaporLines= — — <br />CAS=Clean Air Seperator <br />VT= Vent Lines <br />Example STP/S/L= Turbine/Sensor/Line <br />Date map was drawn: —3—/-29—/-2014— <br />Instructions <br />3_/29/_2014_ <br />Instructions <br />gym` <br />dao <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locationsof the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps,dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site <br />Plan was prepared. <br />https://www.gl iffy.00m /go/htm l5/3297848?toke=&app=1 b5094b0-6042-11 e2-bcfd-0800200c9a66&dev=false 1/3 <br />