Laserfiche WebLink
L L 6� - <br />JUN Sumanuary 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: Pilot -Flying J #618 Date of Testing: 05/04/2016 <br />Facility Address: 1501 N Jacktone Rd. <br />Facility Contact: Manager Phone: <br />Date Local Agency Was Notified of Testing .04/27/2016 <br />Name of Local Agency Inspector (if present during testing): Elena Manzo <br />2. TESTING CONTRACTOR INFORMATION <br />Company Name: Jones Covey Group, Inc. <br />Technician Conducting Test: Issac Garcia <br />Credentials': Lr CSLB Contractor ® ICC Service Tech. ❑ SWRCB Tank Tester ❑ Other (Spec) <br />License Number(s): A,B and Haz 804431 <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: X Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: Equipment Resolution: <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />1 <br />T1 Diesel <br />2 3 <br />T2 Diesel T3 Diesel <br />4 <br />T4 87 <br />Bucket Installation Type: <br />1W Direct Bury <br />❑ Contained in Sump <br />L Direct Bury X Direct Bury <br />❑ Contained in Sump ❑ Contained in Sump <br />X Direct Bury <br />❑ Contained in Sum <br />Bucket Diameter: <br />15" <br />15" 15" <br />12:30 pm <br />Bucket Depth: <br />12" <br />12" 12" <br />12" <br />Wait time between applying <br />vacuum/water and start of test: <br />15 minutes <br />15 minutes 15 minutes <br />15 minutes <br />Test Start Time (Ti): <br />6:59pm <br />6:59pm 2:30pm <br />9:30am <br />Initial Reading (RI): <br />6.5175 <br />4.9293 11 5/8" <br />5.4930 <br />Test End Time (TF): <br />7:14pm <br />7:14pm 3:30pm <br />9:45am <br />Final Reading (RF): <br />6.5185 <br />4.9281 11 5/8" <br />5.4928 <br />Test Duration (TF— T,): <br />15 minutes <br />15 minutes 1 hour <br />15 minutes <br />Change in Reading (RF - Rj): <br />0.0010 <br />0.0012 0 <br />0.0002 <br />Pass/Fail Threshold or <br />Criteria: <br />0.002 <br />0.002 0 <br />0.002 <br />Test Result; ; . <br />®P,.,ass l Fail _ <br />, Pass , "❑Fail .. :" Pass":.d Fail <br />pass l Fail . `°' <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Due to repairs and time constraints, with permission of Inspector T3 spill bucket although a direct bury was tested with <br />use of 1 hour visual method. <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: Date: 05/04/2016 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />