Laserfiche WebLink
L' <br />E <br />UNDERGROUND STORAGE TANK MONITORING SYSTEM CERTIFICATION <br />UST Monitoring Site Plan <br />Site Address: Pilot Flying J —1501 N. Jack Tone Rd., Ripon CA <br />LEGEND <br />D=Dispenser <br />P= Monitoring Control Panel <br />S=Sensor <br />STP= Turbine Sump <br />F= FAI Bucket <br />V= Vapur Bucket <br />A= Annular Sensor <br />M= Automatic Tank Gage <br />TS= Transition Sump <br />L= Line Leak Detector <br />Product Lines= <br />Venf Lines= •••••^•••••••• <br />Vapor <br />Lines= <br />CAS= Clean Air Separator <br />VT= Vent Lines <br />Example STP/S/L=Turbine/Sensor /Une <br />o0 <br />L]6 <br />A <br />Sump and Spill Bucket <br />5 <br />Date map was drawn: <br />Instructions <br />If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locationsof the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps,dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line <br />leak detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site <br />Plan was prepared. <br />Page 5 of_ <br />