Laserfiche WebLink
Was vacuum/pressure restored to operating levels in all interstitial spaces? ® Yes ❑ No (If no, describe in Sec. J, below) <br />J. Comments (500 characters max. use additional sheets if needed): <br />TLS -350/ vacuum bracket communication valves. <br />' If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />Page 4 of <br />I. Results of Vacuum/Pressure Monitoring Equipment Testing <br />This page should be used to document testing and servicing of vacuum and pressure interstitial sensors. A copy of this form must <br />be included with the Monitoring System Certification Form, which must be provided to the tank system owner/operator. The <br />owner/operator must submit a copy of the Monitoring System Certification Form to the local agency regulating UST systems <br />within 30 days of test date. <br />Model: TLS -350 <br />System Type: ❑ Pressure; ❑✓ Vacuum <br />1 Component(s) Monitored by this Sensor: Bio -Product <br />Sensor Functionality Test Result: ® Pass; ❑ Fail <br />Interstitial Communication Test Result: Pass; <br />❑ Fail <br />SL Component(s) Monitored by this Sensor: RV -19-20 Product <br />Sensor Functionality Test Result: ® Pass; ❑ Fail <br />Interstitial Communication Test Result: ® Pass; <br />❑ Fail <br />S3Component(s) Monitored by this Sensor: 21-30 Product <br />Sensor Functionality Test Result: Q Pass; ❑ Fail <br />Interstitial Communication Test Result: ® Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail <br />Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail <br />Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail <br />Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail <br />Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail <br />Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail <br />Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />Component(s) Monitored by this Sensor: <br />Sensor Functionality Test Result: ❑ Pass; ❑ Fail <br />Interstitial Communication Test Result: ❑ Pass; <br />❑ Fail <br />How was interstitial communication verified? <br />❑ Leak Introduced at Far End of Interstitial Space;' ❑ Gauge; <br />❑ Visual Inspection; Q Other (Describe in Sec. J, <br />below) <br />Was vacuum/pressure restored to operating levels in all interstitial spaces? ® Yes ❑ No (If no, describe in Sec. J, below) <br />J. Comments (500 characters max. use additional sheets if needed): <br />TLS -350/ vacuum bracket communication valves. <br />' If the sensor successfully detects a simulated vacuum/pressure leak introduced in the interstitial space at the furthest point from the <br />sensor, vacuum/pressure has been demonstrated to be communicating throughout the interstice. <br />Page 4 of <br />