Laserfiche WebLink
En: A:< <br />C��1FOR�`P <br />March 10,2016 <br />Diane Lopez <br />Franzen Hill Corp <br />1100 N J Street <br />Tulare, CA 93274 <br />• <br />40 <br />San Joaquin County <br />Environmental Health Department <br />1868 East Hazelton Avenue <br />Stockton, California 95205-6232 <br />Website: www.sjgov.org/ehd <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />Re: Flying J Travel Plaza #618, 1501 N Jack Tone Rd, Ripon, CA 95366 <br />FIE COPY <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, RENS, RDI <br />Kasey Foley, REHS <br />Adrienne Ellsaesser, REHS <br />Rodney Estrada, REHS <br />Willy Ng, REHS <br />SR0074324 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to cold start the biodiesel tank monitoring panel and replace nine <br />dispensers (fueling # 1-16) on the auto/RV lane side on the underground storage tank (UST) <br />system at the above noted address. The permit has been approved with the following <br />conditions: <br />Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Fatinah Zareef at (209) (209) 953-7311 to arrange the following inspection <br />appointments (a 48-hour notice is required for inspection appointments). <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. <br />A copy of the alarm history shall be printed prior to performing the "cold start" of the <br />Veeder Root system and made available at the time of EHD inspection. <br />b. For the nine dispensers replaced on the auto/RV side: verification that potential <br />leaks in the dispenser piping will drain into the under dispenser containment. <br />c. For the nine dispensers replaced on the auto/RV side: visual inspection for leaks of <br />the reconnected piping in the dispensers. <br />Please be aware that the facility cannot operate the biodiesel UST system prior to <br />the EHD inspection and approval. <br />