My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2021 10:45:06 AM
Creation date
6/23/2020 6:57:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505264_1501 N JACK TONE_2016.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • Page 1 of 3 <br />Elena K. Manzo [EH] <br />From: Diane Lopez [dlopez@franzenhill.com] <br />Sent: Wednesday, March 09, 2016 11:49 AM <br />To: Elena K. Manzo [EH] <br />Subject: RE: Pilot Ripon <br />Yes, only the Biodiesel. <br />Here is a blurp of what we will be doing: <br />Based on the information we have and the commitments we've obtained this is the game plan: <br />- all of the dispensers are programmed with hanging hardware installed ready to be mounted on the islands <br />- tomorrow morning we will take down 4 of the dispensers and install 4 new units <br />leaving the incon ISD system running on the 5 remaining dispensers, we will install veeder root ISD on the bio <br />monitor. Once the ISD configuration is complete for the 4 new units and a cold start is required on the bio tank <br />monitor bio will be taken offline ( unless CUPA allows it to remain in operation until the following morning when <br />the bio monitor will be recertified by Jones Convey. They are evaluating whether not they will allow bio to <br />remain in operation during this window.) Please let operations know bio might go offline. <br />- after the bio certification or overnight if CUPA allows) will then bring the 4 new dispensers into operation and <br />move the probes from the gasoline monitor to the biomonitor. This will not require recertification of the <br />gasoline monitor. <br />- the remaining dispensers will then immediately be taken offline and ISD for the incon will be disconnected <br />from the gasoline diesel monitor. The EMS monitor is simply polling probe readings from the TLS 350 so that will <br />not require recertification. <br />With all the above noted our main question is once we complete the ISD configuration can we run the Bio <br />system prior to inspection on Friday morning (Are you available on Friday AM for inspection?) to verify all <br />sensors are working correctly or atleast run the Monitor to operate ISD and leave the Bio off. <br />Feel free to call me if this email leaves you confused. <br />Thank You, <br />Diane Lopez <br />(559) 688-2977 ext. 3002 <br />From: Elena K. Manzo [EH] [mailto:emanzo@sjcehd.com] <br />Sent: Wednesday, March 09, 2016 11:03 AM <br />To: Diane Lopez <dlopez@franzenhill.com> <br />Subject: RE: Pilot Ripon <br />Hi Diane <br />So the biodiesel monitoring panel only will be cold started? <br />Elena K. Manzo, REHS <br />San Joaquin County <br />Environmental Health Department <br />1868 E. Hazelton Ave. <br />Stockton, CA 95205-6232 <br />Voice: (209) 953-7699 <br />3/9/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.