Laserfiche WebLink
0 0 <br /> San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> =-- —F Linda Turkatte, REHS <br /> 4. 1868 East Hazelton Avenue <br /> Stockton, California 95205-6232 PROGRAM COORDINATORS <br /> Robert McClellon, REHS <br /> - Jeff Carruesco, REHS, RDI <br /> Cq'��..-.:•��P Website: www.sjgov.org/ehd Kasen Foley, RENS <br /> FOR Adrienne Ellsaesser, REHS <br /> September 21, 2016 Phone: (209) 468-3420 Rodney Estrada, REHS <br /> Fax: (209)464-0138 Willy Ng, REHS <br /> JONES COVEY GROUP, INC <br /> 9595 LUCAS RANCH ROAD, <br /> RANCHO CUCAMONGA, CA 93274 <br /> RE: 1501 N JACK TONE RD Re: AMENDED-SR0075219 <br /> FLYING J TRAVEL PLAZA#618* <br /> RIPON, CA 95366 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to replace the direct burry spill containers on diesel Tanks#2 and #3 <br /> with the OPW direct burry spill containers and associated OPW drop tubes, replace the Hose <br /> Master flex connector inside the Bio Shed, and install one Icon split penetration reducer (IC- <br /> RFRIDIG3.5F) and one Icon split reducer boot (ISR3.5x2.4) inside the UDC 14/15 on the <br /> underground storage tank (UST) system at the above noted address. The permit has been <br /> approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Elena Manzo at (209) 953-7699 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). <br /> a. Spill bucket test: Verify minimum 5-gallon capacity and pass a one hour hydrostatic test <br /> (or equivalent). Proper drainage must also be verified. <br /> b. Corrosion protection for spill bucket replacement: Verify corrosion protection for direct <br /> bury spill buckets prior to backfilling. <br /> c. Since concrete will be broken near the tank, a secondary containment test must be <br /> performed on the Tank#2 and #3 once concrete is poured in accordance with the <br /> manufacturer's guidelines. <br /> d. Visual inspection for any leaks in the Bio Shed, post flex connector installation and a line <br /> test by a licensed tank tester. <br /> e. 24-hour hydrostatic test (or equivalent) on UDC-14/15 <br /> f. Secondary containment test on Tank#2 and #3 after concrete is poured. <br /> No fuel delivery into Tank#2 and #3 until the EHD final inspection in connection with the <br /> spill bucket replacement. <br /> 4. Secondary containment testing for the UDC-14/15 sump is required six months after <br /> installation. Provide 48 hours notification to the EHD when this test is scheduled. <br />