My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2300 - Underground Storage Tank Program
>
PR0506004
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 4:07:28 PM
Creation date
6/23/2020 6:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506004
PE
2361
FACILITY_ID
FA0007140
FACILITY_NAME
FLAG CITY SHELL*
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506004_6437 W BANNER_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> RE: New West#1003 6437 W.Banner St.Lodi CA 95242(SR0056597) <br /> 5. Contact Aris Cacapit(468-3453)to arrange the following inspection(s)(a 48-hour notice <br /> is required): <br /> a. The EHD must witness the functionality of the monitoring system to ensure that <br /> monitoring has been restored to meet the requirements of California Code of <br /> Regulations Title 23 and the Health& Safety Code. <br /> b. Before the alarm history is cleared by the"cold start",a current printout must be <br /> created and available for EHD inspection.Inspection may occur during the <br /> functionality test. <br /> 6. If concrete is being broken near the UST,pipeline and tank integrity testing must be <br /> performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br /> guidelines. Results must be received by the EHD within seven days of returning the <br /> facility to operating condition. <br /> 7. An"Underground Storage Tank Certification of Installation/Modification" form(form C) <br /> shall be submitted by the owner or the owners'agent [pursuant to(CCR)2635(d)]before <br /> this upgrade will be considered complete by EHD. <br /> 8. Permit expires 180 days from date of approval. If an extension to the expiration date is <br /> required,a written request must be submitted to the EHD prior to the expiration date. <br /> Thank you, <br /> t <br /> Aris Cacapit,EHS <br /> Environmental Health Specialist <br /> 600 E.Main St. <br /> Stockton,CA 95202 <br /> (209)468-3453 <br /> acacapit@sjcehd.com <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.