My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BANNER
>
6437
>
2300 - Underground Storage Tank Program
>
PR0506004
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2024 4:07:28 PM
Creation date
6/23/2020 6:57:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506004
PE
2361
FACILITY_ID
FA0007140
FACILITY_NAME
FLAG CITY SHELL*
STREET_NUMBER
6437
Direction
W
STREET_NAME
BANNER
STREET_TYPE
ST
City
LODI
Zip
95242
APN
05532019
CURRENT_STATUS
01
SITE_LOCATION
6437 W BANNER ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506004_6437 W BANNER_2008-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
336
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON— 0 0 <br /> ENGINEERING, INC. <br /> New West Petroleum #1003 <br /> 6437 W. Banner St., Lodi <br /> EVR/ISD Upgrade <br /> Scope of Work: <br /> • Install the Healy EVIR system per EO VR-202-H. The facility has existing Healy ORVR, so <br /> the VP-1000's and hanging hardware are existing. The new Healy equipment will be limited <br /> to a Vertical CAS installed adjacent to the existing vent risers, but clear of the existing <br /> underground vent piping. <br /> • Install the INCON ISD system per EO VR-202-H using the "wired-less" flow meters and <br /> pressure sensor. A flow meter will be installed in each of the six(6) existing dispensers and <br /> a single pressure sensor installed in the dispenser closest to the UST's. <br /> • The INCON console will be installed adjacent to the existing Veeder-Root TLS-350 and <br /> interfaced as specified. This work does not require a "cold-start" of the Veeder-Root <br /> console. <br /> • We will perform an Air Quality Pre-Test per EO VR-202-H prior to reopening the facility and <br /> the Final Air Quality within 10 days as required. <br /> Equipment List: <br /> • Healy model 9961 Clean Air Separator—Vertical <br /> • INCON TS-EMS monitor Console <br /> • INCON TS-VFM Flow Meter <br /> • INCON TS-VPS Pressure Sensor <br /> • INCON TS-DTU/P Data Transfer Unit <br /> to i <br />
The URL can be used to link to this page
Your browser does not support the video tag.