Laserfiche WebLink
0 0 <br /> San Joaquin t DIRECTOR <br /> PQuiN <br /> Donna Heran, RENS <br /> �o c0Environmental Health Department ASSISTANT DIRECTOR <br /> e*: St al Street Laurie Cotulla,REHS <br /> .a <br /> Stockton, lif rni PROGRAM COORDINATORS <br /> •' Carl Borgman,REHS <br /> �.•, P Mike Huggins,REHS,RDI <br /> gGjii6W' <br /> Website: S% V.Or /ehCP Margaret Lagorio, REHS <br /> Phone: (209)468-3420 Robert McClellon, REHS <br /> Fax: (209)464-0138 .teff Carruesco, REHS,RDI <br /> Kasey Foley, REHS <br /> March 9,2009 <br /> Michael Walton <br /> Walton Engineering,INC. <br /> P.O.Box 1025 <br /> West Sacramento, CA 95814 <br /> Fax: (916)373-1172 <br /> New West#1003 6437 W.Banner St.Lodi CA 95242(50056597) <br /> The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the permit application to perform an ISD/EVR phase H upgrade.The permit has been approved <br /> with the following conditions. <br /> Conditions of approval: <br /> 1. Contact the local fire department,local planning or building department and the San <br /> Joaquin Valley Air Pollution Control District for any applicable permits. <br /> 2. Any changes shall be submitted to the San Joaquin County Environmental Health <br /> Department(EHD) for approval prior to commencing work.All new addenda supercede <br /> the previous ones. <br /> a. All components must be certified by an independent testing organization and <br /> labeled as required by the organization. (UL,ULC,ANSI,API,ASTM,etc. See <br /> California Code of Regulations(CCR),Title 23 Chapter 16 Table B for complete <br /> list). The component must bear the appropriate mark as required by the <br /> independent testing organization.Be sure that all equipment installed is <br /> compatible. <br /> 3. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br /> a. One of several permissible valid,current contractor's licenses issued by the <br /> Contractors State License Board(may be issued to the installation company),and <br /> b. All valid,current California UST certificates issued by the International Code <br /> Council(ICC),that are applicable to the work being performed,and <br /> c. A valid,current certificate of training from the manufacturer(s)of the <br /> component(s)being tested,repaired,or serviced; <br /> d. Each person installing or testing any component must hold a certificate of <br /> training from the manufacturer of that component. <br /> Page 1 of 2 <br />