Laserfiche WebLink
SWRCB, January 2006 <br />Spill Bucket Testing Report Form <br />This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br />printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br />1. FACILITY INFORMATION <br />Facility Name: FLAG CITY SHELL Date of Testing: <br />Facility Address: 6437 WEST BANNER ST LODI CA <br />Facility Contact: RUPI Phone: <br />Date Local Agency Was Notified of Testing :02-17-14 R s 20 <br />Name of Local Agency Inspector (f present during testing): SAN JOAQUIN CO ARIS <br />7 rrU CTTN!` !`l11VTD A !''Tl1D 11NT.l11DM A TTl1N <br />Nt1.UNM. <br />Company Name: AFFORDA TEST 4162 nd Street Galt, CA 95632 (209) 744-0112 Fax: (209) 744-0116 <br />Technician Conducting Test: ❑ Lyle D. Nimmo ® Zane A. Nimmo ❑ David A. Winkler ® Felix G. Ramirez <br />5249115 -UT 5263322 -UT 5263373 -UT 5273934 -UT <br />N Credentials': ® ICC Service Tech. ® SWRCB Tank Tester I <br />3. SPILL BUCKET TESTING INFORMATION <br />Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br />Test Equipment Used: TAPE / <br />r....,. �,.._...., <br />Identify Spill Bucket (By Tank <br />Number, Stored Product, etc. <br />Bucket Installation Type: <br />H2O <br />.. <br />1 87 <br />® Direct Bury <br />El Contained in Sump <br />...�.. <br />2 91 <br />® Direct Bury <br />E] Contained in Sump <br />Equipment Resolution: <br />3 DIESEL <br />® Direct Bury <br />El Contained in <br />Sump <br />1/16 <br />4 <br />Direct Bury <br />El Contained in <br />Sum <br />Bucket Diameter: <br />11 <br />11 <br />1 l <br />Bucket Depth: <br />13 <br />13 <br />13 <br />Wait time between applying <br />vacuum/water and start of test: <br />_ <br />Test Start Time (Tj): <br />935 <br />935 <br />935 <br />Initial Reading (Ri): <br />12 <br />12 <br />12 <br />Test End Time (TF): <br />1035 <br />1035 <br />1035 <br />Final Reading (RF): <br />12 <br />12 <br />12 <br />Test Duration (TF — Tj): <br />1 HOUR <br />1 HOUR <br />1 HOUR <br />Change in Reading (RF - Rj): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or <br />Criteria: <br />_ <br />Test Result: <br />0 Pass ❑ Fail <br />®, Pass ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />®PW BUCKETS <br />CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br />I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br />Technician's Signature: j Date:03-13-14 <br />' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br />may be more stringent. <br />