Laserfiche WebLink
SWRCB, January 2002 <br />11 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Piping Manufacturer <br />❑; Other (Spec) <br />Test Method Used: X Pressure <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Piping Run #1 <br />Piping Material: Fiberglass <br />Piping Manufacturer: Smith <br />Piping Diameter: 3" <br />Length of Piping Run: Approx. 280' <br />Product Stored: Regular 87 <br />Method and location of Test boot at <br />piping -run isolation: STP Piping Sump #1 <br />Wait time between applying 5 Minutes <br />pressure and starting test: <br />Test Start Time: 8:35 <br />Initial Reading (Ri): 3 Psi <br />Test End Time: 9:35 <br />Final Reading (RF): 3 Psi <br />Test Duration: I Hour <br />Change in Reading (RF-Ri): 0 Psi <br />Pass/Fail Threshold or No Loss in Psi <br />Criteria: <br />Test Result: Pass <br />SEP a o'� of <br />❑ Industry Standard ❑! Professional Engineer <br />ENVIRONMENTAL HEALT <br />L Vacuum ❑ HQUaWTMENT <br />Piping Run #2 <br />Fiberglass <br />Smith <br />3" <br />Approx. 265' <br />Super 91 <br />Test boot at <br />STP Piping Sur <br />5 Minutes <br />8:45 <br />3 Psi <br />9:45 <br />3 Psi <br />1 Hour <br />0 Psi <br />No Loss in Psi <br />Pass <br />Equipment Resolution: 1/10-15 Psi <br />Piping Run #3 Piping Run # <br />Fiberglass <br />Smith <br />3" <br />Approx. 70' <br />Diesel <br />Test boot at <br />92 STP Piping Sump #3 <br />5 Minutes <br />8:55 <br />3 Psi <br />9:55 <br />3 Psi <br />1 Hour <br />0 Psi <br />No Loss in Psi <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />