Laserfiche WebLink
11 U1 U(, if...lJIAll IItVUL 6BLia1611 VV{C4881UVaAVIV ! iU <br /> SWRCB,January 2002 Page of <br /> S. SECONDARY PIPE TESTING <br /> Test Method Developed By: Piping Manufacturer an Professional Engineer <br /> Other(Spect&) <br /> Test Method Used: Vacuum Hydrostatic <br /> Other(S ►�y) <br /> Test Equipment Used: Equipment Resolution: <br /> Piping Ru7�7 Piping Run -g ping Run#a I Piping Run# <br /> ° 7Losgthoffting <br /> Material: i <br /> Manufhcturer: ,�.,-f e !, �in-► <br /> Diameter: <br /> Run: <br /> Product Stored: <br /> Method and location of '�r„s S i em �•«►� i 'ris°s/4�rt+c 4 f.� 6 .�^ <br /> i ' -run isolation: $�....• <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> stardn test: <br /> Test Start Time: <br /> Initial Reading(Rt): 5"1 tv <br /> Test End Time: 1: 'f 0 - b Z'. 5' <br /> Final Reading(RF): 1 t s 51 s <br /> Test Duration: ! r1/•. ( 4't. i 6r, <br /> Change in Reading(RF-Rt): .6�)ns Ar <br /> Paso/Fail Threshold or o /bs. ® 163, 4 s <br /> Criteria: <br /> Teat Result: 0 Paas &W Pass ❑Fall jrPass 0 Fail 0 Pass 0 Fail <br /> Comments—tinclude i a ion on re ies trade rior to testing, and recon mended Ilow- or oiled tests <br /> e 2.j <br /> 7 ? s - �u t &Ihti.• a`� �te.� <br /> � wK--3 '�...� ca wot .�. Z... ♦ nS�er.L <br />