Laserfiche WebLink
11-U1-U( 1L. RUM PAWhi ft81L1Y UV11Z)1AUU11VO ruj <br /> SW'RCB,January 2002 Page _ of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: Sump Manufacturer stry Stan Professional Engineer <br /> Other peci <br /> Test Method Used; Pressure Vacuum ydros <br /> Other(S 10) <br /> Test Equipment Used: �,,, Equipment Resolution: <br /> Sump NIZ 26and= Sump# I Sump# Sump# <br /> ' sump Diameter: <br /> Sump Depth: <br /> Sump Material: 1 F <br /> Height from Tank Top to Top of <br /> Hi est P!p' Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 3 .3 <br /> Condition of sump prior to testing: .4 CO&W.4 <br /> Portion of Sump Tested' u (u 1 J <br /> Does turbine shut down when <br /> sump sensor detects liquid(both 49 No NA 12 No NA Yes No NA Yes No NA <br /> oduct and water)?* <br /> Turbine shutdown responses time 5" SA-0- <br /> Is system programmed for fail-safe <br /> shutdown?+ dN No NA No NA Yes No NA Yes No NA <br /> Was fail-safe verified to be v� No NA 1q No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 140 M i vt L Q <br /> test: <br /> Test Start Time: 1 -:ra <br /> Initial Reading OW. 2-L 0 4;— <br /> Test End Time: F21. <br /> Final Reading(RRp): <br /> Test Duration: �" r eA•,,v. <br /> Change in Reading(Rr-RI): _o d• i <br /> PassMail Threshold or Criteria: <br /> Test Readt Otyass ❑Fall ®CPass 0 Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? XOO No NA No NA Yes No NA Yes No NA <br /> Was sensor properly replaced.and No NA No NA Yes No NA Yes No NA <br /> verified functional after testing <br /> COMMents—(lrulWe information on repairs made prior 10 Resting, and recommended follow-up for failed Nsts) <br /> 77 5L&--O <br /> x Z fud <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to guy of the questions i ad® an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />