Laserfiche WebLink
PUBLIC HEALTH SERVICES HEALTH DIVISION ENVIRONMENTAL <br /> 304 E. Weber Ave., Third Floor, Stockton, CA 95202 <br /> (209) 468-3420 <br /> UNDERGROUND STORAGE TANK(UST) PROGRAM INSPECTION REPORT <br /> Facility Name <br /> Facility Address:2 S Title rv�a Phone No. <br /> Facilty Contact )w - ate`«� Number of T(s) <br /> Program ID# <br /> UST#/Product Mechanical <br /> Overfill Prevention: Audible and Visual Pressure Suction <br /> Piping system: Gravity 3 ass <br /> Monitoring system '- <br /> Automatic pump shutdown satisfies CCR2636 (g): Yes No <br /> VIOLATIONS) <br /> The above facility is not in compliance with the following section(s)of Health&Safety Code <br /> (HSC)and/or California Code of Regulations (CCR): <br /> 1 HSC 25284 Permit to operate <br /> *)-HSC 25292.3 Upgrade compliance certificate/sticker <br /> 3 CCR 2711(b) &(c) Current State Form A&B <br /> 47-HSC 25292.2 Certification of financial responsibility and letter from chief financial <br /> officer <br /> 5 CCR 2630 (d) Continuous monitoring system for UST system <br /> 6 CCR 2636(c)(1) All releases in secondary piping flow to a collection sump <br /> 7 CCR 2636(a) Secondary containment for piping is waterproof <br /> 8�CR 2636(f)(2) Automatic line leak detector(s) <br /> 9 ZCCR 2636(f)(1) Continuous monitoring system for underground piping <br /> 10 CCR 2632 (c)(2) Continuous monitoring system for UST <br /> 11 HSC 25291(a)(2) Secondary containment for UST is tight <br /> 12 CCR 2636(f)(1) Continuous monitoring system for dispenser system <br /> 13:ZCCR 2635 (b)(1) Spill container <br /> 14 CCR 2635 (b)(2) Overfill prevention system <br /> 15 CCR 2631 (a) Primary containment is product-tight <br /> 16 HSC 25292.1 UST system is operated to prevent unauthorized:release <br /> 17 CCR 2650 Recording/reporting unauthorized release <br /> 18 CCR 2632 (d) Monitoring and response plan <br /> 19 CCR 2712 (i) Monitoring and response plan is on site <br /> 20 CCR 2712(b) Maintenance and monitoring records <br /> 21 CSR 2636(f)(4) Annual line tightness test <br /> 22 ,/CCR 2630(d) Annual line leak detector test <br /> 23 CCR 2630 (d) Annual monitoring certification <br /> 24 CCR 2643 (d) Daily monitoring of suction piping that is not continuously <br /> monitored <br /> l of_, <br /> PHS 260(8/04.'00) <br />