My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQJA CPT Controller Manual <br /> Line-Leak Detection <br /> The Red Jacket CPT system can provide compliance with EPA ° <br /> requirements for hourly leak detection. This feature provides 3-gph <br /> positive shutdown when a leak is detected. The 3-gph leak <br /> detection feature replaces the mechanical line-leak detector that <br /> would normally be installed on the pump. <br /> Stand-alone Pump Operation <br /> The CPT Controller's microprocessors are preprogrammed from the <br /> factory for stand-alone operation. Instructions in chapter 3 explain <br /> how to set the DIP switches for stand-alone operation, and <br /> instructions in chapter 4 explain how to set the pump pressure to <br /> achieve the maximum flow rate of 10 gpm per nozzle. The installer <br /> sets the required pressure at the controller to maintain the pressure <br /> necessary to deliver a maximum of 10 gallons per minute (gpm) to <br /> the dispenser whether one or numerous nozzles are operating. <br /> Tandem Pump Operation <br /> When two CPT pumps are required to maintain proper flow, these <br /> units can be programmed to operate in tandem. The installer can <br /> designate one controller as the master unit and the other as the <br /> auxiliary unit. The master controller monitors line pressure to <br /> maintain proper flow. <br /> .I <br /> When the master controller receives the dispense-enable signal, the <br /> primary pump starts. The controller varies the speed of the pump <br /> depending on the pressure in the line. When the primary pump can <br /> no longer maintain proper pressure, the secondary pump turns on to <br /> supplement the pressure and maintain proper flow. <br /> For each dispensing cycle, the master controller determines which <br /> CPT will be the primary pump. This feature allows the pumps to <br /> alternate and prevents the problem of having one tank run dry. It <br /> also ensures that one pump does not wear excessively. The master <br /> controller performs line-leak detection, if required. <br /> t <br /> Chapter 1:Introduction 1-2 ARE260-240 Rev.A ♦ 6/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.