My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CPT Controller Manual dl RE®,A <br /> CKET <br /> Step 8: Wrap the open end of the resin pouch with electrical tape <br /> or wire tie (not included), and leave the pouch in a wire-up position <br /> until the resin gels. <br /> DO NOTturn the resin pouch upside down until it has <br /> au ion r hardened. <br /> Sealing Wire Connections in the Optional Connector Board and <br /> Housing <br /> The following steps describe the task of sealing wire connections in <br /> the optional connector board and housing. <br /> Green Wir Tie From Pressure <br /> Transducer <br /> Red <br /> Threaded Cap <br /> Housin Connector Board <br /> Black <br /> Threaded Cap Wire Tie <br /> To the CPT <br /> Controller Compression Fitting <br /> FIGURE 3.13 OPTIONAL CONNECTOR BOARD AND HOUSING <br /> Make sure that the power is turned off until the <br /> C UO connector board and housing are installed. <br /> Step 1: Remove the threaded end caps (not the compression <br /> fitting) from the housing. <br /> Step 2: Feed the cables through the compression fittings in each <br /> threaded cap, pulling enough cable through one threaded cap to <br /> accommodate sliding the housing over it. <br /> Step 3: Strip the insulation on the conductors back about '/$inch. <br /> Step 4: Connect the conductors as follows: <br /> 0 red with red <br /> 0 green with green <br /> 0 black with black <br /> ARE260-240 Rev.A ♦ 6/97 3-17 Chapter 3:Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.