My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CPT Controller Manualto *_"�REDJACKET <br /> Step 1: Attach and secure the Tandem interface cable between the <br /> RS-232 DB9 connectors on both CPT Processor boards. <br /> d <br /> 1 a4+ <br /> ast� <br /> ar y v.r <br /> FIGURE 3.14 ATTACHING THE RS-232 CABLE <br /> Step 2: On both controllers, attach the Input wires as described in <br /> the section called "Running and Attaching the Input Power." <br /> Step 3: Attach the dispense-enable signal wires to the terminals on <br /> the master controller's Inverter board as described in "Running and <br /> Attaching the Dispenser Input." <br /> Notice/ For tandem operation,the dispense-enable wires must <br /> be connected to the master controller. <br /> Step 4: On both controllers, attach the Output wires as described in <br /> the section called "Running and Attaching the Output Power." <br /> Step 5: Install the transducer and I.S. barrier by following the <br /> instructions in the appropriate section listed in the "Installing the <br /> Intrinsic Safety Barrier and Pressure Transducer." <br /> Njo ct e/ For tandem operation,the transducer wires must be <br /> connected to the master controller. <br /> ARE260.240 Rev.A ♦ 6/97 3-19 Chapter 3: Installation <br />
The URL can be used to link to this page
Your browser does not support the video tag.