My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® + <br /> L-XREDJACKET- CPT Controller Manual - <br /> Purging Air from the Line <br /> i <br /> Step 1: Purge excessive air from the line. <br /> \ 71 If air is trapped in the line,the ability of the pressure <br /> Notice J <br /> transducer to sense a leak may be hampered. <br /> Therefore, clearing the air from the pipeline is <br /> extremely important. <br /> Step 2: Start the pump and open the nozzle farthest from the <br /> submersible pump, dispensing about 20-30 gallons of fuel. <br /> Step 3: Purge ALL remaining air from the system by dispensing <br /> about 5-10 gallons from each remaining nozzle, working from the <br /> farthest dispenser toward the pump. <br /> Step 4: Check the system for leaks. <br /> cOF- If the line-leak alarm occurs, try adjusting the functional element <br /> by turning the adjustment screw all the way downward and then <br /> back up two turns. This will set the functional element at about <br /> 22 psi. <br /> 1 <br /> 6 <br /> Chapter 4: Operation 4-2 ARE260-240 Rev.A ♦ 6/97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.