Laserfiche WebLink
REDJACKET. <br /> ® CPT Controller Manual <br /> Testing the Installation <br /> Test the piping and the tank to make certain the system is installed <br /> correctly. <br /> Piping may be tested by blocking lines at each dispenser and <br /> closing the pump check valve. Use testing methods in accordance <br /> with nationally certified line-testing standards and applicable local <br /> codes. <br /> Tanks may be tested by closing the pump check valve and applying <br /> pressure at the tank test port. Use testing methods approved by <br /> national and local standards. Final testing of tanks before startup <br /> must be done in accordance with nationally certified tank-testing <br /> methods and applicable local codes. <br /> a <br /> Chapter 4:Operation 4-8 ARE260-240 Rev.A ♦ 6/97 <br />