My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CPT Controller ManualA 10 4REDJACKET. <br /> Symptom Probable Cause Suggested Action <br /> Pressure transducer failure Failed transducer/faulty wiring. Fix wiring or replace transducer as <br /> with leak detection enabled needed. <br /> Pressure transducer failure Failed transducer/faulty wiring. Fix wiring or replace transducer as <br /> without leak detection needed. <br /> enabled. <br /> Pump not able to maintain Reverse pump rotation. Turn off power to controller and <br /> set-point pressure. switch two power leads. <br /> Reverse rotation detected. Reverse pump rotation. Turnoff power to controller and <br /> switch two power leads. <br /> RV6 , RV8, or RV9 burnt out. ♦ AC input wiring incorrect. Check wiring diagram. <br /> ♦ Excess voltage at input <br /> terminals. <br /> Shorts in wiring downstream Pumping viscous or high ♦ Check product being pumped. <br /> from controller specific gravity fluids. ♦ Check wiring between pump <br /> and controller. <br /> ARE260-240 Rev.A ♦ 6/97 5-9 Chapter 5: Service and Repair <br />
The URL can be used to link to this page
Your browser does not support the video tag.