Laserfiche WebLink
l5 5 203--651543 T4NxNOLOGY <br /> ' <br /> Monitor Certification Inspection <br /> ARCO Products Company <br /> This |a8mrcertifies that themonitnr(s) is/are mplace, the probes are incorrect position and the sysem <br /> /snperadngproperly. <br /> 04/Z]/I999 <br /> Station <br /> n�4` Oaoe <br /> » __�___ a� Tp� |napeioAdd,e»s ��� x a n <br /> �e_PermitAnnua| <br /> --------'---'— <br /> Recheck Leak <br /> ' =� <br /> Type & Model of h1nn'to- DER ROOT TLS35o <br /> _'- <br /> System Function <br /> Tanks Annular Space In Tank <br /> paps Fall N/A Pass Pail N/A <br /> � X <br /> ss� om���� ^ —___— _-___ _____ <br /> ---- ---- ---- a <br /> nsc omLEao ^ <br /> Pacnzce X <br /> Prc-duct Lines Turbine Sump In-Line Turbine Sump F/\| Sump <br /> Paou Fail N/A Pass Fail N/A Pass Fall N/A <br /> xx x <br /> F E G ��� � <br /> � �� � � <br /> _—_--- --___ <br /> �nEozoH X <br /> When monitor inturned off ormalarm, isthere positive shutdown (fturbines? Yee X Mn <br /> UNo, were precision product /in* tests peMormec' Yes No <br /> Monitor Panel ' <br /> |nthe monitor panel mounted and labeled correctly? y <br /> Does monitor alarm horn function properly? Y <br /> Is panel accessible and v's/Nn to station personnel? � <br /> Replace all failed probes? Yes No N/A <br /> |fNo, probes tobereplaced/repaired by (Dato) <br /> Inspected By: Contractor TATOCZ10109Y <br /> Technician aNE"I'L CSaND <br /> Signature <br />