My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jerry Yoshioka. <br /> San Joaquin County <br /> Environmental Health Division -2- July 31, 1997 <br /> 6. The model number for the Veeder Root Interstitial Sensor Interface Module is VR 329356-002 <br /> (see revised Sheet TK4-3) <br /> 7. The dual fill ports for the 20,000-gallon tank are equipped with 5-gallon overfill/spill containers <br /> on both the fill and Stage I vapor recovery risers as shown on Sheet TK2-1B. Each fill location <br /> is equipped with an overfill prevention drop tube as specified on Sheet TK4-3. Ball float valves <br /> are located on the opposite side of the tank(turbine side) where the vent and Stage II vapor <br /> recovery headers enter the tank, as shown on Sheets TK2-lA and TK2-1B. <br /> 8. Siphon lines(active and future)are double-contained as shown on Sheets TK2-lA and TK2-1B, <br /> and the details shown on Sheet TK3-2. They shall be compliance tested as pressurized piping. <br /> Res tfully, <br /> Stephen H. Kirk <br /> Design Engineer <br /> SHK/jss/ps <br /> 5951C.031 <br /> enc: As Noted <br />
The URL can be used to link to this page
Your browser does not support the video tag.