Laserfiche WebLink
SAN JOAQUIN COU ABLIC HEALTH SERVICES - ENVIRONMENTAL HEALOIVSION <br /> UNDERGROUND STORAGE TANK PROGRAM - FEE WORKSHEET <br /> S FACILITY SITE NAME FACILITY CONTACT NAME <br /> I ARCO AM/PM Mini-MARKET Store Manager <br /> T <br /> E FACILITY ADDRESS SITE PHONE # with AREA CODE <br /> 2470 Grant Line, Road <br /> & <br /> A CITY Tracy STATCAEI ZIP 95376DE at SITEof NKS <br /> P <br /> P APPLICANT/BILLING NAME APPLICANT CONTACT NAME <br /> L Barghausen Consulting Engineers Stephen Kirk <br /> I <br /> C MAILING ADDRESS APPLICANT PHONE # WITH AREA CODE <br /> A 18215 72nd. Ave. S. (;0'6) 251-6222 <br /> NSTATE ZIP CODE TYPE of APPLICATION <br /> T CITY <br /> KENT WA 98032 (Closure, Installation, etc.) <br /> TOTAL <br /> 1986 1987 1988 1989 1990 <br /> ANNUAL FACILITY FEE (Prior to January 1, 1991) = $100.00 <br /> A XXXX XXXX XXXX XXXX XXXX $ XXXXXXXX <br /> C <br /> T FACILITY PENALTY FEES ASSESSED (If Applicable) XXXX XXXX XXXX XXXX XXXX $ XXXXXXXX <br /> i <br /> V TANK FEE = $50.00/TANK (Prior to January 1,1991) $170/TANK (After January 1, 1991) <br /> E <br /> # Tanks = 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 <br /> F (multiply #rbyL for - <br /> A each year applicable) XXXX XXXX XXXX XXXX XXXX ' n- 5 '5(d Dg0101 <br /> C <br /> I TANK PENALTY FEES ASSESSED I XXXX XXXX XXXX XXXX XXXX $ <br /> L5 18.50 <br /> 1 STATE SURCHARGE FOR NEW FACILITIES ONLY = $18.50 iUW D407010 <br /> T <br /> Y # Tanks 7 x $8.00 1988 through 1990 (S56) 1991 through 1996 ($56) 1997 <br /> SURCHARGE FOR 1997 XXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXX <br /> MANENT CLOSURE emova or Authorize -los`irye-in-Place) NK I.D. #(s) <br /> O C_OS E FEE = 5 .00/hour (3 hours nimum/TANK # ANK(s) $234. = $ <br /> S 7 1 & 2 <br /> U TEMPORY CLOSU E (Plan Rev ew & I pections) TANK I.D. #(s) <br /> R <br /> E TEMPORARY URE FEE = $78.00/hour (3 hours minimum/ ITY) $234.."00,`mini MI. 5 2 <br /> P INSTALLATION PLAN CHECK (Plan Review & Construction Inspections) TANK I.D. #(s) <br /> L (r�_ <br /> A <br /> N PLAN CHECK FEE = 578.00/hour (8 hours minimum/FACILITY) = 5624.00 minimum $ <br /> R REPAIR FEE (Workplan Review & Construction Inspections) TANK I.D. #(s) <br /> E <br /> P TANK LINING REPAIR FEE = 578.00/hour (3 hours minimum/TANK) # TANK(s) X $234.00 = $ <br /> A <br /> I TANK RETROFIT REPAIR FEE = $78.00/hour (3 hours min./FACILITY) = $234.00 minimum $ <br /> R <br /> PIPING REPAIR FEE = $78.00/hour (3 hours minimum/FACILITY) _ $234.00 minimum $ <br /> M TRANSFER FEE = $20.00 UNAUTHORIZED RELEASE EVALUATION = $78.00/hr $ <br /> I <br /> S <br /> C1 CONSULTATION FEE _ $78.00/hr SAMPLING INSPECTION FEE _ $78.00/hr $ <br /> TOTAL DUE 5998.50 <br /> FOR OFFICE USE ONLY <br /> _........................:::::::::::::::::::::::-::::::::::::::-:::::::.—::::::::::-:::::::::.::...-._:..................:::::::::::::::::::::::-:::::::::::::::_:::: ::::::::::::::::::r::::::......:::::-::::::......::::.:.:....................................::.....-:::::r:::::::: <br /> ............ ::::::::::::::-::::::-.... <br /> .._................................................. ........................................................................................................................................::::::-::::::::::r::-:r:::::::::�::::::::::....:.....:.:.:.................:::::::%kii.::- <br /> _..............................................................................._........-::.....................................................................................---_..........................._................ :.:.........._.....................................................:............_........`"�!�-M��,«M— =:`€ <br /> :::r.._........................................................................................._.................._...._.......................... <br /> SWEEPS # COMPUTER # LOC CODE DIST CODE AMOUNT RECEIVED CHECK #/CASH RECEIVED BY DATE RECEIVED <br /> 5 <br /> l..................................................... <br /> ......................................::.:::::.:::. .:::::::::::::::r::r:::::::::::::::::::. ::::::::::::::::::::::::::r:...................... <br /> _..........._.......1.:.... :................................................................................................................:..:......... <br /> ::::::::: ::r:::: ::r:::::::::.::: <br /> EH 23 032 (REVISED 5-27-97) <br />