Laserfiche WebLink
ID : AUG 13 '98 15 : 19 No .002 P .03 <br /> 0 is <br /> MONITORING AND , , P J AN-XB <br /> H <br /> ",f0NDARY CONTAINMENT OE <br /> NES WITH <br /> SUBMERSIB),E—PUMP SHUTDOWN&NQI�NEg,-,HAN1CA1Jj1,EKAKK DDEETFECTORS <br /> ARCO Facility: Address: 2A'%(1 (--,y-AN3k 1,kkTV—"R6PA <br /> This plan is designed to meet the monitoring and response requirements of Section 2632, Article 3, <br /> Title 23,CCR. <br /> 1. MQNITOIUNG KQWf—M—RNT <br /> Secondarily contained stoyage,tanks and lines at this facility are monitored by a continuous <br /> electronic leak detection system whicli consists of an alarm panel., sons and associated <br /> electronics. Liquid sensors are installed in the annular space of mh double all tank and <br /> product line piping sump. Whenever asemsor dctcrns the,presence of a liquid lbe're,in both a <br /> visual and audible alarm at the control panel. Inaddition, the continuous monitor on the, <br /> product piping system will shut down the pump and activatc the ala nn sYstem when a <br /> release is detected ori the continuous product piping monitoring system f1tils or is <br /> disconnected,the pumping system will shut down, <br /> 2. MAINTENANCri,SCHFMI]LE_OFMONITORING EOUIPM NT <br /> The continuous electronic leak detection system wfll beinspected according to the <br /> manufacturer's instructions by an outside contractor once during each calendar year. <br /> 3. ROUTINE M <br /> On a daily basis the facility operator%hall-. <br /> A. <br /> Ins est The control panel for visual and audible alarmsignals to confirm that <br /> the unit is operating. <br /> B. inspect island and tank fill as for signs of spillage or petroleum sheen. <br /> C. Record the inspection observations on the Daily Visual Monitoring Log <br /> (Form APPC-765-. attacbed.) <br />