My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ID : AUG 13 '98 15 : 19 No .002 P .03 <br /> 0 is <br /> MONITORING AND , , P J AN-XB <br /> H <br /> ",f0NDARY CONTAINMENT OE <br /> NES WITH <br /> SUBMERSIB),E—PUMP SHUTDOWN&NQI�NEg,-,HAN1CA1Jj1,EKAKK DDEETFECTORS <br /> ARCO Facility: Address: 2A'%(1 (--,y-AN3k 1,kkTV—"R6PA <br /> This plan is designed to meet the monitoring and response requirements of Section 2632, Article 3, <br /> Title 23,CCR. <br /> 1. MQNITOIUNG KQWf—M—RNT <br /> Secondarily contained stoyage,tanks and lines at this facility are monitored by a continuous <br /> electronic leak detection system whicli consists of an alarm panel., sons and associated <br /> electronics. Liquid sensors are installed in the annular space of mh double all tank and <br /> product line piping sump. Whenever asemsor dctcrns the,presence of a liquid lbe're,in both a <br /> visual and audible alarm at the control panel. Inaddition, the continuous monitor on the, <br /> product piping system will shut down the pump and activatc the ala nn sYstem when a <br /> release is detected ori the continuous product piping monitoring system f1tils or is <br /> disconnected,the pumping system will shut down, <br /> 2. MAINTENANCri,SCHFMI]LE_OFMONITORING EOUIPM NT <br /> The continuous electronic leak detection system wfll beinspected according to the <br /> manufacturer's instructions by an outside contractor once during each calendar year. <br /> 3. ROUTINE M <br /> On a daily basis the facility operator%hall-. <br /> A. <br /> Ins est The control panel for visual and audible alarmsignals to confirm that <br /> the unit is operating. <br /> B. inspect island and tank fill as for signs of spillage or petroleum sheen. <br /> C. Record the inspection observations on the Daily Visual Monitoring Log <br /> (Form APPC-765-. attacbed.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.