My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e <br /> improved overall system design Easy Installation 3 <br /> insures that solid,air free Our two-wire field connec- <br /> product is consistently tion and easy access ground <br /> delivered to dispensers. wire terminal facilitate quick, PE <br /> simple installation.And,a fe. <br /> Low Maintenance fully extractable head permits nE <br /> Engineering changes removal of the pump motor pr <br /> in head design permit unit without disturbing se <br /> quick and inexpensive discharge piping and electrical <br /> pressure testing and wiring.Threads and seat are E <br /> maintenance.No special provided for adding a line leak <br /> tools are required and all detector so that additional P( <br /> manifold components housing is not necessary. of <br /> y are readily accessible Built-in syphon capability v< <br /> `tilizing from the driveway means that more than one tank ti <br /> iew technologies, surface.Even can be used for each grade of SE <br /> 'E Petro has designed though service gasoline with one pump required tc <br /> i pump system which and mainte- for each product.A stationary r( <br /> Edvances the state-of-the- nance is manifold is provided with a 2" <br /> in in pump design.Feature infrequent, outlet for dispenser piping and U <br /> )y feature,the FE Petro a 4"nipple is furnished for <br /> submerged Turbine Pump mounting the pump to the tank. 1C <br /> .s unmatched in performance c <br /> ind efficiency. Reliability a. <br /> Available in four pump The combination of high tech ti <br /> 3i: vith'A,-%or 1%2 horse- design and quality components <br /> po,,..;r motors,these models make the FE Petro Submerged <br /> will meet or exceed the pumping field Turbine Pumping System the b <br /> needs of both small and large mechanics most reliable unit available. F <br /> service stations. will find FE Petro uses only Franklin f, <br /> The FE Petro Submerged these units Electric motors.Franklin <br /> Turbine Pumping System offers easy to work Electric has been pro- <br /> t <br /> you better,more efficient and on.And,it is ducing motors for the t <br /> less,expensive service than ever not necessary petroleum industry a <br /> before possible. to bring in an since 1956-19nger <br /> electrician toa than any other <br /> High Performance break an electrical a manufacturer. <br /> Considerably higher heads connection when the <br /> and faster delivery rates are pump motor needs to <br /> now possible due to FE Petro's be changed.A special <br /> new high tech pump design explosion-proof electrical <br /> and the use of Franklin Electric enclosure is a standard feature. <br /> high efficiency motors.Oper- One simple step automatically <br /> ating costs will be lower than disconnects the power to the _. <br /> competitive units since less pumping unit.Our unique line i= <br /> electrical energy is needed for check valve system eliminates <br /> each gallon being pumped. environmental contamination <br /> Engineering breakthroughs when pulling the pump.This <br /> have been combined with solid feature eliminates the problems <br /> rel'^bility to produce the best associated with spilling product <br /> P, ping systems available.And, onto the ground around the pump. <br />
The URL can be used to link to this page
Your browser does not support the video tag.