My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* City of Tracy minimum requirements. <br />It is possible that site grading, utility line backfilling, and/or underground storage tank installation <br />could alter the distribution of near -surface materials requiring reevaluation of the recommended <br />pavement structural sections. It is our understanding that the City of Tracy will require that the <br />R -Value for the subgrade soil be verified during construction with additional testing. <br />The aggregate base should meet CALTRANS specifications for Class 2 base or the specifications <br />for Processed Miscellaneous Base (PMB) as contained in the Standard Specifications for Public <br />Works Construction. <br />The above pavement sections are based upon the assumption that the subgrade is uniformly <br />compacted to at least 90 percent relative compaction to a depth of 12 inches at the time of base <br />placement. Final geotechnical observation and testing of subgrade should be performed just prior <br />to the placement of aggregate base. <br />Aggregate base should be compacted to at least 95 percent relative compaction. <br />Site grading will be required to achieve plan grades and to provide uniform structural support. <br />Recommendations for site grading are presented in the following subsections, while general guide <br />specifications for placement of fill and backfill are presented in Appendix C. <br />6.9.1 Clearing and Grubbing <br />Clearing and grubbing of the site will be required to remove all vegetation and unsuitable material <br />prior to grading. Topsoil, and soil containing vegetation, organics and/or humus, should be <br />removed and used in planters or disposed off-site. The roots of existing trees and/or brush in the <br />construction area should be removed by over -excavation and replaced with compacted fill. <br />It is essential that excavations created by removing vegetation roots and other unsuitable materials <br />should be backfilled with clean fill soil and should be compacted in accordance with the <br />requirements presented below. <br />JN 4M7-095-01 <br />U*=s* ?-o6jm%ftneo.a« <br />M, <br />
The URL can be used to link to this page
Your browser does not support the video tag.