My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
diameter shall not be used. Imported fill soil should have a expansion index no greater <br />than 25. <br />7) Fill soils shall be placed in lifts not exceeding 6 inches, brought to within plus or minus <br />two percent of optimum moisture content and compacted to not less than the density <br />specified below. <br />S) Fill slopes shall be constructed at intervals not exceeding 4 feet vertically. Placement of <br />fill shall -not continue until the slope face, at a depth of 6 inches, measured perpendicular <br />to the slope face, has been tested and found to be compacted to at least the density <br />specified below. <br />9) All fill and backfill shall be compacted to at least 90 percent of the laboratory dry density <br />as determined by the ASTM D1557 test procedure, except as noted in the geotechnical <br />report. <br />10) Areas to receive backfill shall be cleared of trash, debris, and loose, soft, or disturbed <br />soils. Prior to placement of backfill, the areas shall be observed and approved by the <br />Project Soils Engineer. <br />11) Backfill shall be compacted by mechanical means to the density specified above. The <br />contractor shall select equipment and techniques to accomplish compaction of the backfill <br />to the specified density such that backfilling operations will not result in movement or <br />damage to completed work. <br />12) Observation and compaction tests shall be performed by the Project Soils Engineer at the <br />time of fill and backfill placement to verify that the specified percentage of moisture <br />content and the required degree of compaction have been obtained. Where the <br />requirements or specifications are not met, additional effort shall be made with <br />appropriate adjustment of the compaction energy or moisture content as necessary until <br />the requirements and the specifications are met. <br />13) Wherever, in the opinion of the Soils Engineer or Owner's Representatives, an unstable <br />condition is being created, either by cutting or filling, the work shall not proceed in that <br />area until an investigation has been made and the grading recommendations revised, if <br />necessary. <br />IN 40007.095-01 <br />ft1t�-06j-1ah n-_doc <br />2of2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.