My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEK UST INSTALLATION INSPECTION RE <br /> FACILITY NAME: 4:: ADDRESS: Z4 40 1.4';,,e ' aR <br /> FACILITY ID* TANKS � ��(�� UL;* TANK AMM/MATERIAL. 1(ERy <br /> CAPACITY: 20,000 PRODUCT: U L <br /> A I <br /> P N ALL TANKS TO 3E INSTALLED AND TESTED IN ACCORDANC <br /> P I WITH MANUFACTURER WRITTEN SPECIFICATIONS <br /> R T <br /> 0 I <br /> V A <br /> E L <br /> 0 S <br /> ITEM OR EQUIPMENT INSPECTED <br /> DATE <br /> 1. UST PLANS SUBMITTED/ FEES PAID CH;S CMF 25287) <br /> 2. UST INSTALLATION PLANS APPROVED <br /> INITIAL INSPECTIONS <br /> 3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br /> VACAIM: SOAP: PSI: HRS/MIN: 3RINE(LICUID ANNULAR): OTHER: <br /> 4. PRIMARY TANK TEST. PSI: HRS/MIH: <br /> 5. TANK APPROPRIATELY PLACED WITH APPROVED 3ACXFILL \Z11 (,cLue l (APT/PEI) <br /> PIPING INSPECTIONS <br /> PRIMARY PIPING TEST (MINIMI91 40 PSI= Arm4PAMIA 't.'�Uojo 300014 (� 2636 (e)) <br /> 7. SECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (crz Z636 (e)) <br /> 3. LAKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br /> Y I 9. UNUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br /> I10. OVERSPILL PERFORMANCE TEST (CCA 26335 (b) (1) (C)) <br /> II I11. ALL PIPING AND FITTINGS CORROSION ?Rmc,.?, D (CCt 2636 (b)) <br /> I I12. PIPING SLOPES TQ COLLECTION SUMP (CC% 2636 (c)(1)) <br /> FINAL INSPECTION <br /> I13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES CCCA 2632 (c) (2)) <br /> 14. PERFORMANCE TEST OF CONTINUOUS MONITORING STSTEM (PANEL)T,, )-3S O (CCR 2632 (c) (2)) <br /> I15. PERFORMANCE TEST OF LINE LEAK DETECTION aQ (CCC 2643 Cc) (1)) <br /> I16. PERFORMANCE TEST OF AUTCMATIC PUMP SYSTEM SNOT-AFF (ccA ?,636 (s)) <br /> 17 <br /> 3ALL FLOAT VALVES INSTALLED VP W 53 VML <br /> 18. OVERFILL PROTECTION INSTALLm/APPROV® Mea W vieictbo A j(oo (CC2 2635 (b) (2)) <br /> I19. TANK ACCESS PORTS 3ROUGNT TO GRADE (LOCXM AND WATERTIGHT) APT <br /> II I20. TANK INTEGRITY TEST (PASSING HARD COPT) (CCR 2635 (a) (5)) <br /> iI21. MONITORING PLAN, RESPONSE PLAN AND LOG 300K ON SITE (CCR 2632 (d)) <br /> iI I22. "C' FORM CCNPLECTO AND SUBMITTED C= 26335 (d)) <br /> I23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br /> I24. ALL CONDITIONS MET; FACILITY PERMIT ISSUE) (H+S CME 25284) <br /> =4MENTS: <br /> EHZ3-•]06 9/95 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.