My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_1997-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:13:51 PM
Creation date
6/23/2020 6:57:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2002
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_1997-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
420
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> a <br /> 4. RESPONSE PLAN <br /> OPERATOR RESPONSIBILITIES <br /> A. LEAK RECORDING AND REPORTING PROCEDURE <br /> Whenever an alarm is activated, station personnel are to immediately: <br /> a. Contact ARCO Maintenance or its designated agent by using the telephone number previously <br /> provided. <br /> b. If any visible indications of petroleum products or vapors are noticed call 911. <br /> c. Make an entry in the Recordable Discharge Log (Form APPC-765-1: attached) <br /> d. Complete the Recordable Discharge Log when and as the source of the alarm is known. <br /> ARCO RESPONSIBILITIES <br /> B. METHOD OF REMOVING AN UNAUTHORIZED RELEASE FROM THE SECONDARY <br /> CONTAINMENT <br /> a. Any unauthorized release into the secondary containment system of a product tank will be <br /> removed by pumping. Uncontaminated product may be returned to the tank. Contaminated <br /> product may be returned to the refinery to be recycled or may be disposed of following <br /> procedures in accordance with California Health Safety Code requirements. In the event of an <br /> emergency, a pumping contractor or truck will be available immediately. In all other cases, <br /> equipment availability will be within 12 hours. <br /> b. ARCO Maintenance will be responsible for authorizing and selecting contractors for the work <br /> to be performed. <br /> 5. TRAINING <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, training needed for <br /> the operation of the tank system and monitoring equipment includes: <br /> How to: <br /> ► Take tank level measurements <br /> ► Read dispenser meters <br /> ► Inspect equipment <br /> ► Recognize warning signs: dispenser hesitations, meter spins and odors <br /> ► Manually close dispenser impact valve <br /> ► Replace dispenser filters <br /> ► Shut down the system with and location of: ARCOmatic switch, electrical panel breakers, and <br /> emergency shutoff switch <br /> ► Test the electronic monitor <br /> -2- 5951.006[Al/ps] <br />
The URL can be used to link to this page
Your browser does not support the video tag.