My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Table of Contents <br /> 6 Checking the PLLD System <br /> PLLD System Checkout Procedure ...............................................................................6-1 <br /> 1.Vent The Line....................................................................................................6-1 <br /> 49 <br /> 2. Determine PLLD Transducer Pressure Offset...................................................6-1 <br /> 3. Purge Air from the Line......................................................................................6-2 <br /> 4. Enable the Line for Dispensing..........................................................................6-2 « <br /> Checking the Site's Emergency Stop Switch .................................................................6-3 <br /> Appendix A: PLLD Safety Instructions.........................................................A-1 <br /> Figures <br /> Figure 1-1. FE Petro"R"Style Precision Check Valve ...........................................1-3 <br /> Figure 3-1. PLLD Interface Module Wiring Diagram ..............................................3-3 <br /> Figure 3-2. PLLD Transducer-to-Controller Module Wiring ....................................3-4 <br /> Figure 4-1. Sealing surface for SwiftCheck Valve's external O-ring ......................4-2 <br /> Figure 4-2. SwiftCheck Valve and PLLD Transducer Installation ..........................4-2 <br /> Figure 4-3. Example PLLD Installation in a Red Jacket Maxxum Big-Flo ..............4-3 <br /> Figure 4-4. Modifying the Functional Element in Red Jacket Pumps .....................4-4 <br /> Figure 4-5. Locating Relief Valve on Tokheim Pumps ...........................................4-5 <br /> Figure 4-6. Check Valve Assembly for Bennett Pumps ............................................4-6 <br /> Figure 4-7. Red Jacket Pump Pressurstat Adjustable Valve Assembly .................4-6 <br /> Figure 4-8. Location of PLLD Transducer and Model R Precision Check <br /> Valve in FE Petro Pump ......................................................................4-7 <br /> Figure 4-9. Dip Switch SW2 and Rotary Switch locations in the <br /> FE-Petro IST-VFC unit .........................................................................4-8 <br /> Figure 4-10. PLLD Installation in Red Jacket Quantum Pumps ...............................4-9 <br /> Figure 4-11. Manifolded Product Lines PLLD Installation Example- <br /> Dual Red Jacket Pumps, Single Tank ...............................................4-11 <br /> Figure 4-12. Manifolded Product Lines PLLD Installation Example- <br /> Multiple Tanks with Red Jacket Pumps .............................................4-11 <br /> Figure 4-13. PLLD Install.w/Healy Mini-Jet Sys. .................................................4-12 <br /> Figure 4-14. WARNING Tag ..................................................................................4-13 <br /> Figure 5-1. Epoxy Sealant Connections .................................................................5-3 <br /> Figure 5-2. PLLD System and Pump Control Diagram for <br /> Red Jacket Relay Control Box .............................................................5-4 <br /> Figure 5-3. STP Power Interlock Relay Installation ...............................................5-4 <br /> Figure 5-4. Red Jacket Maxxum Big-Flo Single-Phase Wiring ..............................5-5 <br /> Figure 5-5. Red Jacket Maxxum Big-Flo 3-Phase Wiring ......................................5-5 <br /> Figure 5-6. PLLD System and Pump Control Diagram for Non-Red Jacket <br /> RelayControl Box ................................................................................5-6 <br /> Figure 5-7. Wiring Diagram- Manifolded Product Lines PLLD- <br /> SingleTank, Dual Pumps ....................................................................5-7 <br /> Figure 5-8. Wiring Diagram- Manifolded Product Lines PLLD- Multiple Tanks ...5-8 <br /> Figure 5-9. PLLD System and Pump Control Diagram for Gilbarco <br /> Dispenser Isolation Box .......................................................................5-9 <br /> Figure 5-10. Manifolded product lines-dual FE Petro IST-VFC Controllers .........5-10 <br /> Figure 5-11. Manifolded product lines-dual Red Jacket IQ Controllers ................5-11 <br /> Tables <br /> Table 1-1. PLLD Required Kits ................................................................................1-3 <br /> Table 1-2. PLLD System 848480-001 .....................................................................1-4 <br /> Table 1-3. PLLD System 848480-003 .....................................................................1-4 <br /> Table 1-4. Non-Vented Valve Kit 330020-416 ........................................................1-4 <br /> Table 4-1. Dip Switch (SW2)Settings .....................................................................4-8 <br /> Table 4-2. Rotary Switch Positions..........................................................................4-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.