Laserfiche WebLink
9 0 <br /> PLLD Site Prep and Installation Guide PLLD Controller Module Wiring <br /> TLS 350 CONSOLE IQ2 <br /> 4-RELAY OUTPUT MODULE <br /> + 1 2 2 3-3 4 O O <br /> yy NC NO NC NO C NC NO C NC <br /> N04C <br /> p COP.1- COf.i I"ILD D1 U. M2 M1it <br /> O <br /> ® ® o o ® ® D4 ® � Q© QD ® IN TO PUMP I <br /> #2 = <br /> � - <br /> � 230VAC <br /> PUMP OUTPUT IQ2 <br /> COM \`�NO C COM <br /> + / + <br /> POWER AREA OF CONSOLE VR RELAY <br /> PRESSURE LINE LEAK CONTROLLER MODULE RS 485 <br /> COMMUNICATI O <br /> 1 2 3 N <br /> O P1 PR U Po 71 PR L9 PO P1 PR L1 PO _ <br /> ED <br /> O G G d0 69080806 m COM- SHIELD <br /> i <br /> l� lD IQ1 <br /> O O <br /> COF+- COP.1. cry_ U] Dt Pl{$2 +M I L'. L:_' <br /> plidvjigwir.eps T r 1 <br /> PUMP OUTPUT I01 N TO PUMP <br /> #1 - <br /> L1 <br /> N 230VAC <br /> j DISPENSER HOOK <br /> Figure 5-11. Manifolded product lines-dual Red Jacket IQ Controllers <br /> WIRING CONNECTIONS <br /> 1. Turn Off,tag,and lock out all AC power to the Console,dispensers and STPs. <br /> 2. If you have two PLLD Controller Modules,Position 1 is the first position on the module that is physically lower in <br /> the console's Intrinsically Safe bay and Position 4 is the first position in the module that is physically higher in the <br /> bay. <br /> IMPORTANT! The console software will identify PLLD Controller Module positions 1-3 (one module)and 4-6(op- <br /> tional second module,highest in I.S.bay)with PLLD Interface Module positions 1-6.Therefore you must wire the <br /> PLLD System so that the STP connected to position I on the PLLD Controller Module has the PLLD transducer in- <br /> stalled that is connected to the position I on the PLLD Interface Module.The same relationship holds for the remain- <br /> ing 5 positions. <br /> 3. Connect the AC Line from the"Dispenser ON Switch"to the wire leading to the PI(PUMP IN)terminal on the <br /> PLLD Interface Module. <br /> 4. Connect the wire from the PO(PUMP OUT)terminal on the module to the hot side of the STP control box relay(or <br /> S2 relay connection if a Red Jacket relay control box)side of the pump contactor. <br /> 5. Connect the PR(PUMP RETURN/AC NEUTRAL)wire from the module to the AC Neutral line(Figure 5-2 on <br /> page 5-4 and Figure 5-9).For other systems,PR is connected to the neutral side of the pump contactor relay and to <br /> the AC Neutral line(Figure 5-6 on page 5-6). <br /> 5-11 <br />