My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Do not switch On power to the console.This must be done by a Authorized Service Contractor during the warranty <br /> checkout and Start-Up Procedure!A Authorized Service Contractor must program the PLLD set-up information into the <br /> M console before beginning these PLLD system checks. <br /> PLLD System Checkout Procedure <br /> Repeat the four steps below for each PLLD monitored line. <br /> 1. VENT THE LINE <br /> a. Turn Off,lock out,tag power to the STP. <br /> b. Vent the line to zero. <br /> c. Reseal the line. <br /> d. Turn On power to the STP. <br /> 2. DETERMINE PLLD TRANSDUCER PRESSURE OFFSET <br /> New transducers are now factory sealed and their internal chamber cannot be equalized to atmospheric pressure by <br /> opening a vent screw as in the past.The Pressure Offset test procedure described in this step must be performed when <br /> using new PLLD transducers with serial numbers of 100,000 or above, in sites located at altitudes above 2,000 feet. <br /> Note: this procedure can also be used with transducers having serial numbers below 100,000 instead of using the vent <br /> screw to equalize pressure. <br /> Before this procedure is performed,the pressure in the line MUST be vented to zero.It is recommended that this <br /> procedure be performed immediately after installing the transducer,before energizing the STP. <br /> Run Pressure Offset Test <br /> Press MODE to display DIAGNOSTIC MODE, then FUNCTION until you see the message: <br /> PRESSURE LINE LEAK DIAG <br /> PRESS<STEP>TO CONTINUE <br /> From the PLLD Diag message,press STEP until you see the display below <br /> Q 1:PLLD NUMBER 1 <br /> P OFFSET TEST<ENTER> <br /> Press ENTER and the results of the last test displays (`No Test Data Available' message appears if this is the first test): <br /> Q 1:PRESS OFFSET TST PSI <br /> NO TEST DATA AVAILABLE <br /> • Press STEP: <br /> Q 1:START P OFFSET TEST <br /> PRESS<ENTER> <br /> 6-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.