My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JOE POMBO
>
2430
>
2300 - Underground Storage Tank Program
>
PR0506796
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2021 1:15:55 PM
Creation date
6/23/2020 6:57:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0506796
PE
2361
FACILITY_ID
FA0007634
FACILITY_NAME
ARCO AM PM #82602*
STREET_NUMBER
2430
STREET_NAME
JOE POMBO
STREET_TYPE
PKWY
City
TRACY
Zip
95376
APN
214-020-200-000
CURRENT_STATUS
01
SITE_LOCATION
2430 JOE POMBO PKWY
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506796_2430 JOE POMBO_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
442
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> This manual contains procedures for the instaltation or replacement of the Red Jacket Variable Speed Flow <br /> Controller(VSFC).This manual assumes all preliminary site preparation is completed,and that field wiring <br /> from the pumps to the VSFC is in place. <br /> Reference Manuals - As Required <br /> o The Red Jacket STP installation, Service, Parts Manual -P/N 577013-830 <br /> • Ouantum 4"STP tnstallation,Operation, &Service Manual-P/N 042-129-1 <br /> • 4" STP and AG Pump Installation,Operation, &Service Manual -P/N 042-153-1 <br /> PLLD tPressurized Line Leak Detection) Site Prep and Installation Guide-P/N 576013-902 <br /> FXV Leak Detectors Installation Instructions - P/N D042-106-1 <br /> Contractor Certification Requirements <br /> Veeder-Root requires the following minimum training certifications for contractors who will install and setup <br /> the equipment discussed in this manual: <br /> Level 1 Contractors holding valid Level 1 Certification are approved to perform wiring and conduit routing, <br /> equipment mounting,probe and sensor installation,tank and line preparation,and line leak detector <br /> installation. <br /> Level 2/3 Contractors holding valid Level 2 or 3 Certifications are approved to perform installation checkout, <br /> startup,programming and operations training,troubleshooting and servicing for all Veeder-Root Tank <br /> Monitoring Systems,including Line Leak Detection and associated accessories: <br /> Warranty Registrations may only be submitted by selected distributors. <br /> Safety Precautions <br /> The following safety symbols are used throughout this manual to alert you to important safety hazards and <br /> precautions: <br /> I <br /> i EXPLOSIVE FLAMMABLE <br /> +t Fuels and their vapors arej� -� Fuels and their vapors are extremely <br /> extremely explosive if ignited. flammable: <br /> ELECTRICITY TURN POWER OFF <br /> • <br /> High voltage exists in and is l=ive power to a devise creates a potential <br /> supplied to,the device.A shock hazard.Turn Off power to the <br /> potential shock hazard exists. device and associated accessories when <br /> servicing the unit <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.